Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Supply of steel.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Stage II prequalified mechanical contractors only. Remove and replace 8 packaged rooftop units and 2 high-capacity direct-exchange VAV air handlers including new gas, electrical, controls, factory startup, and test & balance. Location: Draper DMV/DL, Draper, UT. Construction budget ~ $645,000. Mandatory pre-bid meeting required. Bid bond 5% required; performance and payment bonds at 100% of contract sum; must meet DFCM/Utah standards and specified fabricator/roofing requirements.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
Stage II prequalified mechanical contractors only. Remove and replace 8 packaged rooftop units and 2 high-capacity direct-exchange VAV air handlers including new gas, electrical, controls, factory startup, and test & balance. Location: Draper DMV/DL, Draper, UT. Construction budget ~ $645,000. Mandatory pre-bid meeting required. Bid bond 5% required; performance and payment bonds at 100% of contract sum; must meet DFCM/Utah standards and specified fabricator/roofing requirements.
Premium
Access the largest public sector contact database
Installation of approx. 778 LF of 12" and 306 LF of 16" Class 54 ductile iron Pipe (DIP) water main, along with associated valves, fire hydrants, and fittings. The new DIP water main will be installed by open-cut methods in a new trench along Old Donaldson Avenue, and MD- 170.
Posted Date
Nov 3, 2025
Due Date
Dec 16, 2025
Release: Nov 3, 2025
Close: Dec 16, 2025
Installation of approx. 778 LF of 12" and 306 LF of 16" Class 54 ductile iron Pipe (DIP) water main, along with associated valves, fire hydrants, and fittings. The new DIP water main will be installed by open-cut methods in a new trench along Old Donaldson Avenue, and MD- 170.
AvailableSupply of wood.
Posted Date
Dec 10, 2025
Due Date
Dec 15, 2025
Release: Dec 10, 2025
Close: Dec 15, 2025
Supply of wood.
AvailableRelease: Dec 10, 2025
Close: Dec 15, 2025
Supply of doors.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis