Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes to install a new power pole and meter box and connect power to the new air monitoring shelter.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2026 summer work at multiple sites.
Posted Date
Sep 25, 2025
Due Date
Dec 18, 2025
Release: Sep 25, 2025
Close: Dec 18, 2025
2026 summer work at multiple sites.
AvailablePremium
Access the largest public sector contact database
Provide professional air quality/air emission monitoring/regulatory compliance permitting services
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Close: Jan 13, 2026
Provide professional air quality/air emission monitoring/regulatory compliance permitting services
AvailableFurnish and Install Complete Wiring of One Type I Well Enclosure (Rear); Furnish and Install Complete Wiring of One Type II Well Enclosure (Front); Install Conduits in Open Trench; 4" PVC (Sch. 40); Install Conduits in Open Trench; 3" PVC (Sch. 40); Install Conduits in Open Trench; 2" PVC (Sch. 40); Install Conduits in Open Trench; 1-1/2" PVC (Sch. 40); Install Conduits in Open Trench; 1" PVC (Sch. 40); Install Conduits in Open Trench; 3/4" PVC (Sch. 40); Install Conduits in Open Trench; 4" Galvanized Steel; - Install Conduits in Open Trench; 3" Galvanized Steel; 70 LF of 4" HDPE Install Directional boring. See outside link.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Furnish and Install Complete Wiring of One Type I Well Enclosure (Rear); Furnish and Install Complete Wiring of One Type II Well Enclosure (Front); Install Conduits in Open Trench; 4" PVC (Sch. 40); Install Conduits in Open Trench; 3" PVC (Sch. 40); Install Conduits in Open Trench; 2" PVC (Sch. 40); Install Conduits in Open Trench; 1-1/2" PVC (Sch. 40); Install Conduits in Open Trench; 1" PVC (Sch. 40); Install Conduits in Open Trench; 3/4" PVC (Sch. 40); Install Conduits in Open Trench; 4" Galvanized Steel; - Install Conduits in Open Trench; 3" Galvanized Steel; 70 LF of 4" HDPE Install Directional boring. See outside link.
AvailableElectrical work. See attached file and outside link.
Posted Date
Dec 3, 2025
Due Date
Jan 7, 2026
Release: Dec 3, 2025
Close: Jan 7, 2026
Electrical work. See attached file and outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis