Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Village of River Forest seeks a professional engineering firm for design engineering services to install electric vehicle charging infrastructure at five Village-owned locations. The project requires substantial experience in EV infrastructure design and aims to enhance the Village's EV charging capabilities as outlined in its 2023 Electric Vehicle Infrastructure Network Study.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes electric vehicle charging facility expansion.
Posted Date
Nov 4, 2025
Due Date
Dec 16, 2025
Release: Nov 4, 2025
Close: Dec 16, 2025
The project includes electric vehicle charging facility expansion.
AvailablePremium
Access the largest public sector contact database
Project includes electrical vehicle charging station installation project
Posted Date
Dec 3, 2025
Due Date
Dec 22, 2025
Release: Dec 3, 2025
Close: Dec 22, 2025
Project includes electrical vehicle charging station installation project
AvailableFurnish and install two Level 2 chargers and four Level 2 charging ports including wiring and protective bollards.
Posted Date
Nov 24, 2025
Due Date
Dec 19, 2025
Release: Nov 24, 2025
Close: Dec 19, 2025
Furnish and install two Level 2 chargers and four Level 2 charging ports including wiring and protective bollards.
AvailableThe City of Mt. Shasta is soliciting bids to purchase and install two Level 2 EV chargers at the City of Mt. Shasta Corporation Yard, including all associated materials and equipment. The scope requires installing two 100 Amp OCPD breakers and 2" electrical conduit with two single-phase circuits and specifically requires AUTEL MAXICHARGE ULTRA AC DUAL PORT chargers; the contractor must warranty work for 12 months and complete the project within 30 days. The city may consider optional barrier posts and reserves the right to accept/reject bids and select the proposal that best meets its needs.
Posted Date
Dec 8, 2025
Due Date
Dec 23, 2025
Release: Dec 8, 2025
Close: Dec 23, 2025
The City of Mt. Shasta is soliciting bids to purchase and install two Level 2 EV chargers at the City of Mt. Shasta Corporation Yard, including all associated materials and equipment. The scope requires installing two 100 Amp OCPD breakers and 2" electrical conduit with two single-phase circuits and specifically requires AUTEL MAXICHARGE ULTRA AC DUAL PORT chargers; the contractor must warranty work for 12 months and complete the project within 30 days. The city may consider optional barrier posts and reserves the right to accept/reject bids and select the proposal that best meets its needs.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis