Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes repair and replacement of various types of roofing needs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide construction/various.
Posted Date
Sep 23, 2025
Due Date
Dec 18, 2025
Release: Sep 23, 2025
Close: Dec 18, 2025
Provide construction/various.
AvailablePremium
Access the largest public sector contact database
The South Carolina Department of Natural Resources is soliciting bids for the construction of a 24’x50’x10’ tubular metal frame storage building with two concrete trench foundations and 15' wide bays at the McCormick – Bordeaux Work Center in McCormick, SC. The construction cost range is estimated at $10,000–$20,000 and bid documents may be obtained by contacting Engineering@dnr.sc.gov. Bids are due December 18, 2025 at 2:00 PM local time; the posting is an Invitation for Bid (not a grant) and is currently open.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
The South Carolina Department of Natural Resources is soliciting bids for the construction of a 24’x50’x10’ tubular metal frame storage building with two concrete trench foundations and 15' wide bays at the McCormick – Bordeaux Work Center in McCormick, SC. The construction cost range is estimated at $10,000–$20,000 and bid documents may be obtained by contacting Engineering@dnr.sc.gov. Bids are due December 18, 2025 at 2:00 PM local time; the posting is an Invitation for Bid (not a grant) and is currently open.
AvailableConstruction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
Posted Date
Jul 12, 2025
Due Date
Jan 28, 2026
Release: Jul 12, 2025
Close: Jan 28, 2026
Construction of approximately 265 LF of restored stream, reconnected floodplain, rebuilt bank, and in-stream structures.
AvailableLong-term contracts to purchase index storage credits (ISCs) from eligible bulk energy storage projects.
Posted Date
Jul 29, 2025
Due Date
Jan 29, 2026
Release: Jul 29, 2025
Close: Jan 29, 2026
Long-term contracts to purchase index storage credits (ISCs) from eligible bulk energy storage projects.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis