Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Eau Claire Area School District
The Eau Claire Area School District is seeking bids to refinish the gym floor at Eau Claire Memorial High School, with plans and specifications available at a non-mandatory pre-bid meeting on December 9, 2025. Bids are due December 17, 2025; contact Jeff Nestor (jnestor@ecasd.us, 715-579-9505) for documents and questions.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Eau Claire Area School District
The Eau Claire Area School District is seeking bids for the Roosevelt Elementary School Parking Lot Replacement project consisting of milling and overlay of approximately 36,000 SF of asphalt pavement and re-striping at Roosevelt Elementary School (3010 8th Street, Eau Claire, WI 54703). A non-mandatory pre-bid meeting is scheduled for 12/02/2025 and bids are due 12/10/2025 at 1:00 PM Central.
Posted Date
Nov 18, 2025
Due Date
Dec 10, 2025
Release: Nov 18, 2025
Eau Claire Area School District
Close: Dec 10, 2025
The Eau Claire Area School District is seeking bids for the Roosevelt Elementary School Parking Lot Replacement project consisting of milling and overlay of approximately 36,000 SF of asphalt pavement and re-striping at Roosevelt Elementary School (3010 8th Street, Eau Claire, WI 54703). A non-mandatory pre-bid meeting is scheduled for 12/02/2025 and bids are due 12/10/2025 at 1:00 PM Central.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Clarkstown Central School District
Work include refinishing stage and gym wood floors.
Posted Date
Aug 26, 2025
Due Date
Jan 13, 2026
Release: Aug 26, 2025
Clarkstown Central School District
Close: Jan 13, 2026
Work include refinishing stage and gym wood floors.
AvailableMccook Park District
Work includes to repair and refinishing of the gymnasium floor.
Posted Date
Nov 6, 2025
Due Date
Dec 2, 2025
Release: Nov 6, 2025
Mccook Park District
Close: Dec 2, 2025
Work includes to repair and refinishing of the gymnasium floor.
AvailableValley Heights Unified School District
School Gym Floor Repair, Staining, Relining, Repainting and Refinishing. Work includes, but is not limited to, the following tasks: • Approximate Square Footage: 9400 sq ft · • Preparation: Remove bleachers, all thresholds, and baseboard Relining the Gym Floor: Repaint lines for basketball, volleyball,. in compliance with current regulations and specifications. Additional lines may be discussed during your site visit. Center Art Work will be our VH Mustang Mascot. End Lines will have wording MUSTANGS. • Staining and Refinishing the Floor: Sanding, repairing, re-coating, staining and refinishing the wood floor to restore its appearance and functionality, ensuring a smooth, durable finish suitable for athletic use. • Floor Preparation: Preparation of the existing floor surface, including cleaning, sanding, and repairs of any damaged or worn areas before refinishing.
Posted Date
Nov 20, 2025
Due Date
Dec 1, 2025
Release: Nov 20, 2025
Valley Heights Unified School District
Close: Dec 1, 2025
School Gym Floor Repair, Staining, Relining, Repainting and Refinishing. Work includes, but is not limited to, the following tasks: • Approximate Square Footage: 9400 sq ft · • Preparation: Remove bleachers, all thresholds, and baseboard Relining the Gym Floor: Repaint lines for basketball, volleyball,. in compliance with current regulations and specifications. Additional lines may be discussed during your site visit. Center Art Work will be our VH Mustang Mascot. End Lines will have wording MUSTANGS. • Staining and Refinishing the Floor: Sanding, repairing, re-coating, staining and refinishing the wood floor to restore its appearance and functionality, ensuring a smooth, durable finish suitable for athletic use. • Floor Preparation: Preparation of the existing floor surface, including cleaning, sanding, and repairs of any damaged or worn areas before refinishing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →