Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Department of Commerce NOAA Regional Offices
Eaton 93M UPS and sidecar w/o MBM and Battery cabinet with batteries installed at the following locations:(See installation instructions below) Qty: tbd see effectivity Must meet the following requirements: Life Cycle support: (1) Shall be repairable by the manufacturer or a vendor other than the manufacturer. (2) Shall have a life cycle of at least 15 years. (3) Shall have maintenance documentation provided. (4) Shall have a training program for maintenance available for a later date. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
260-Network Contract Office 20 (36C260)
Specialized tools and training to perform 40 battery removal, replacement and recycle of 1 Eaton 93PM-100-IAC UPS (SN EP374UJJ08) and 1 Eaton 93PM-L-120 UPS (SN EQ042UXX08).
Posted Date
Nov 14, 2025
Due Date
Nov 25, 2025
Release: Nov 14, 2025
260-Network Contract Office 20 (36C260)
Close: Nov 25, 2025
Specialized tools and training to perform 40 battery removal, replacement and recycle of 1 Eaton 93PM-100-IAC UPS (SN EP374UJJ08) and 1 Eaton 93PM-L-120 UPS (SN EQ042UXX08).
AvailableFlorida Department of Transportation
UPS Installation.
Posted Date
Oct 22, 2025
Due Date
Nov 18, 2025
Release: Oct 22, 2025
Florida Department of Transportation
Close: Nov 18, 2025
UPS Installation.
Wichita County
Furnish and deliver 25kw (3) & 50kw (1) propane generators
Posted Date
Nov 13, 2025
Due Date
Nov 24, 2025
Release: Nov 13, 2025
Wichita County
Close: Nov 24, 2025
Furnish and deliver 25kw (3) & 50kw (1) propane generators
AvailableNorth Dakota State University Main Campus
North Dakota State University seeks bids to deliver, install, and dispose of UPS batteries for an Eaton Powerware 9395 system at the R2 Data Center in Fargo, ND. The work includes furnishing and installing 120 CSB XPL5700FR batteries in three strings, removing old batteries, and providing support instructions; period of performance is Dec 1, 2025 through Jan 31, 2026.
Posted Date
Nov 3, 2025
Due Date
Nov 21, 2025
Release: Nov 3, 2025
North Dakota State University Main Campus
Close: Nov 21, 2025
North Dakota State University seeks bids to deliver, install, and dispose of UPS batteries for an Eaton Powerware 9395 system at the R2 Data Center in Fargo, ND. The work includes furnishing and installing 120 CSB XPL5700FR batteries in three strings, removing old batteries, and providing support instructions; period of performance is Dec 1, 2025 through Jan 31, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis