Retrieving RFP details
Release
Close
Longwood University
Work includes rooftop clock tower repair. Lower tower section: remove and replace siding/trim, tie into existing single ply membrane. Middle tower section: remove and replace all siding/trim. Remove and reinstall clocks. Remove and replace flatlock apron with fully soldered copper. Upper tower section: remove low slope flatlock roof with tpo membrane. Remove and replace damaged trim and railing.
Eason Clock Tower Repair
zip
Clarkstown Central School District
Clock/District Sound Systems (Indoor/Outdoor) and Intercom System Service and Repair.
City of O'Fallon
Construction work includes the removal and replacement of copper roofing systems.
W6QK Army Contracting Command (ACC) Aberdeen Proving Ground
Clock, panel, NSN: 6645-01-398-9100RK.
Release
Oct 01, 2025
Close
Nov 04, 2025