Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Florida Department of Transportation
Work includes : 5,087 PM sweeping (mechanical).
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Wyoming Department of Transportation
Sweeping of Various state Highways, Interchanges, and Bridge Decks.
Posted Date
Oct 30, 2025
Due Date
Nov 19, 2025
Release: Oct 30, 2025
Wyoming Department of Transportation
Close: Nov 19, 2025
Sweeping of Various state Highways, Interchanges, and Bridge Decks.
Cole County
Work includes removals, clearing and grubbing, grading, excavating, bridge construction, asphalt pavement, guardrail, rock blanket, pavement marking, seeding and mulching, erosion control and other miscellaneous work necessary to remove and replace the bridge road bridge. Also includes 3,920 SY of 6" depth subgrade compaction; 125 SY of bridge approach slab (minor); 958 LF of MGS guardrail; 1,486 LF of permanent fence; see attached file.
Posted Date
Oct 27, 2025
Due Date
Nov 21, 2025
Release: Oct 27, 2025
Cole County
Close: Nov 21, 2025
Work includes removals, clearing and grubbing, grading, excavating, bridge construction, asphalt pavement, guardrail, rock blanket, pavement marking, seeding and mulching, erosion control and other miscellaneous work necessary to remove and replace the bridge road bridge. Also includes 3,920 SY of 6" depth subgrade compaction; 125 SY of bridge approach slab (minor); 958 LF of MGS guardrail; 1,486 LF of permanent fence; see attached file.
AvailableTown of Marshfield
The Project includes the following Work: Cassady Road, Bridge 22 β Demolish old bridge, installation of new bridge (85β clear span, NEDBT precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated wor.
Posted Date
Nov 12, 2025
Due Date
Dec 19, 2025
Release: Nov 12, 2025
Town of Marshfield
Close: Dec 19, 2025
The Project includes the following Work: Cassady Road, Bridge 22 β Demolish old bridge, installation of new bridge (85β clear span, NEDBT precast superstructure on integral abutments supported by driven h-piles), rock armoring, roadway construction, remove temporary bridge, and associated wor.
AvailableGrenada County
Work includes construction of box culvert, box bridges, pre-cast bridge structure, and rental of road equipment and other miscellaneous items needed in the repair of the county roads and bridges and any ditches, erosion control or drainage work.
Posted Date
Oct 29, 2025
Due Date
Dec 15, 2025
Release: Oct 29, 2025
Grenada County
Close: Dec 15, 2025
Work includes construction of box culvert, box bridges, pre-cast bridge structure, and rental of road equipment and other miscellaneous items needed in the repair of the county roads and bridges and any ditches, erosion control or drainage work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis