Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Washington State Department of Enterprise Services
Project generally involves the remodel of twelve bathing suites in two phases, one room per wing (4 on first floor, 8 on second floor). Six remodeled rooms will remain tub rooms, and six remodeled shower rooms are to serve as bariatric showers. Shower rooms include concrete floor slab work and moving water connections for new shower fixtures. Coordinate with owner's contractor for epoxy flooring and base and shower wall surface. Minor electrical work. No fire sprinkler work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Salida
Remodel of an 8,000 SF existing building to create office space consistent with a police department. Including demolition and removal of interior except for core skeletal stuructural. Building is on a concrete slab. New construction of HVAC, electrical, interior walls, parking, fencing and anything necessary for completion of building as an office.
Posted Date
Sep 22, 2025
Due Date
Jan 12, 2026
Release: Sep 22, 2025
City of Salida
Close: Jan 12, 2026
Remodel of an 8,000 SF existing building to create office space consistent with a police department. Including demolition and removal of interior except for core skeletal stuructural. Building is on a concrete slab. New construction of HVAC, electrical, interior walls, parking, fencing and anything necessary for completion of building as an office.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
University of Central Florida
The project will consist of pre-construction and construction services for the renovation/remodel of the Student Union. The UCF Student Union was designed and constructed over 30 years ago, and has undergone many renovations and additions over its lifetime. This project is expected to be a multi-phased renovation of the Student Union, to include, but not limited to: building envelope, MEP systems, interior renovations, as well as branding and graphics.
Posted Date
Jul 21, 2025
Due Date
Dec 18, 2025
Release: Jul 21, 2025
University of Central Florida
Close: Dec 18, 2025
The project will consist of pre-construction and construction services for the renovation/remodel of the Student Union. The UCF Student Union was designed and constructed over 30 years ago, and has undergone many renovations and additions over its lifetime. This project is expected to be a multi-phased renovation of the Student Union, to include, but not limited to: building envelope, MEP systems, interior renovations, as well as branding and graphics.
AvailableSanger Unified School District
School cafeteria remodel.
Posted Date
Jul 2, 2025
Due Date
Jan 9, 2026
Release: Jul 2, 2025
Sanger Unified School District
Close: Jan 9, 2026
School cafeteria remodel.
AvailableVentura Port District
Work consists of demolished and re-built, with new retaining walls, stairs, railings, steel patio covers, site furnishings, lighting, landscaping, and fencing.
Posted Date
Jul 22, 2025
Due Date
Dec 16, 2025
Release: Jul 22, 2025
Ventura Port District
Close: Dec 16, 2025
Work consists of demolished and re-built, with new retaining walls, stairs, railings, steel patio covers, site furnishings, lighting, landscaping, and fencing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →