Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Sanitation Districts Of Los Angeles County
Work includes rehabilitating approx 26,705' of existing corroded 10- through 30-inch dia non-reinforced concrete pipe (nrcp) and reinforced concrete pipe (rcp) on the 56th street east trunk, the avenue p-8 trunk, the avenue q trunk, trunk a, and trunk d sewers with cured-in-place pipe liner. The project will also rehabilitate 94 manholes with a protective coating system, and all appurtenant work. All bids must be fully transmitted by the date and time specified.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Salt Lake City
Rehabilitation of approximately 6,982 feet of 48-inch and 64-inch sewer trunk line by cipp lining, replacement of 1,637 feet of 64-inch sewer trunk line with new 66-inch frp, replacement and rehabilitation of several existing manholes along the sewer trunk line, and all associated dewatering, bypass pumping, and lateral connections required to complete the work.
Posted Date
Oct 24, 2025
Due Date
Nov 21, 2025
Release: Oct 24, 2025
City of Salt Lake City
Close: Nov 21, 2025
Rehabilitation of approximately 6,982 feet of 48-inch and 64-inch sewer trunk line by cipp lining, replacement of 1,637 feet of 64-inch sewer trunk line with new 66-inch frp, replacement and rehabilitation of several existing manholes along the sewer trunk line, and all associated dewatering, bypass pumping, and lateral connections required to complete the work.
AvailableNYC Department of Design & Construction
The New York City Department of Design and Construction (DDC) is soliciting competitive sealed bids for the rehabilitation of sanitary and combined sewers at various citywide locations. Bids are due via PASSPort by 11:00 AM on December 18, 2025 (EPIN 85026B0011).
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
NYC Department of Design & Construction
Close: Dec 18, 2025
The New York City Department of Design and Construction (DDC) is soliciting competitive sealed bids for the rehabilitation of sanitary and combined sewers at various citywide locations. Bids are due via PASSPort by 11:00 AM on December 18, 2025 (EPIN 85026B0011).
AvailableCity of New York
work includes approx 81,780 LF television inspection and digital audio-visual recording of sewers; 40,890 LF sewer cleaning; 4,750 LF 25" to less than 35" CIPP by hot or steam; 2,205 EA re-opening of service connection. See attached file.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
City of New York
Close: Dec 18, 2025
work includes approx 81,780 LF television inspection and digital audio-visual recording of sewers; 40,890 LF sewer cleaning; 4,750 LF 25" to less than 35" CIPP by hot or steam; 2,205 EA re-opening of service connection. See attached file.
AvailableSanitation Districts Of Los Angeles County
Rehabilitate approx. 4,161' of existing corroded 18- and 24" dia. reinforced concrete pipe (RCP) and cracked vitrified clay pipe (VCP) on the joint outfall H unit 8L trunk sewer and the joint outfall H unit 8L relief trunk sewer with cured-in-place pipe liner and 14 manholes with a protective coating system and all appurtenant work.
Posted Date
Nov 5, 2025
Due Date
Dec 9, 2025
Release: Nov 5, 2025
Sanitation Districts Of Los Angeles County
Close: Dec 9, 2025
Rehabilitate approx. 4,161' of existing corroded 18- and 24" dia. reinforced concrete pipe (RCP) and cracked vitrified clay pipe (VCP) on the joint outfall H unit 8L trunk sewer and the joint outfall H unit 8L relief trunk sewer with cured-in-place pipe liner and 14 manholes with a protective coating system and all appurtenant work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis