Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
New York Metropolitan Transportation Authority
MTA Construction & Development is conducting a two-step procurement (RFQ then RFP) to select a design-builder for ADA accessibility upgrades at the Second Avenue, Seventh Avenue, and Morrison Avenue–Soundview subway stations. The project includes new elevators, related station infrastructure work, and a separate long‑term maintenance contract for the elevators.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Foothill Transit Zone
DESIGN-BUILD. Provide design-build services and work for the Electric Bus Charging Station Upgrades.
Posted Date
Sep 12, 2025
Due Date
Dec 4, 2025
Release: Sep 12, 2025
Foothill Transit Zone
Close: Dec 4, 2025
DESIGN-BUILD. Provide design-build services and work for the Electric Bus Charging Station Upgrades.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
District of Columbia Department of General Services
DESIGN-BUILD services for school HVAC upgrades and roof replacement project.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
District of Columbia Department of General Services
Close: Dec 19, 2025
DESIGN-BUILD services for school HVAC upgrades and roof replacement project.
AvailableWashington Metropolitan Area Transit Authority
Design-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
Posted Date
Nov 25, 2025
Due Date
Jan 29, 2026
Release: Nov 25, 2025
Washington Metropolitan Area Transit Authority
Close: Jan 29, 2026
Design-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
AvailableTable Mountain Rancheria
DESIGN-BUILD. Provision of design-build services TMR's healthcare center project.
Posted Date
Oct 21, 2025
Due Date
Dec 5, 2025
Release: Oct 21, 2025
Table Mountain Rancheria
Close: Dec 5, 2025
DESIGN-BUILD. Provision of design-build services TMR's healthcare center project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →