Retrieving RFP details
Release
Close
Borough of Saegertown
Work include demolition of the former heritage building.
City of New Berlin
Mass demolition and removal of structure, footings, foundations and materials. Site is to be returned to natural state.
City of Norwalk
Work includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant work necessary to satisfactorily complete the project. demolition of building and pre-demolition Haz-Mat abatement and other relevant work.
City of Phenix City
1. Remove concrete, curb, and ramp/walkway on east side of building leading to the top floor of building. 2. Fill in elevator shaft/pit at bottom floor level (possible 4' to 5' deep) 3. Remove steps on southwest side of building all the way up on outside of building. 4. All planter walls/raised planters need to be removed. 5. Chiller pad needs to be removed on north end of building on the outside of building. 6. Remove all bench rails and supports around building perimeter. 7. Remove sign post at the front of building near the handicap ramp. 8. Remove monument sign. 9. Foundation, slab and retainage wall may remain.
Release
Oct 20, 2025
Close
Nov 07, 2025