Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Illinois Capital Development Board
Demolish and construct cold/material storage buildings.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Illinois Department of Transportation
Construction of a 4,500 gross SF, unheated, wood framed storage building of s-1 use group. Building includes truck storage bays, salt storage bay with 10 high concrete walls, electrical, lighting, ventilation, man doors, overhead doors, concrete floor, concrete approach aprons and gravel approach driveways.
Posted Date
-
Due Date
Dec 9, 2025
Illinois Department of Transportation
Close: Dec 9, 2025
Construction of a 4,500 gross SF, unheated, wood framed storage building of s-1 use group. Building includes truck storage bays, salt storage bay with 10 high concrete walls, electrical, lighting, ventilation, man doors, overhead doors, concrete floor, concrete approach aprons and gravel approach driveways.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Illinois Capital Development Board
Construction of a 5,760 gross square foot pre-engineered metal clear-span combination Office/Storage building. (Mixed Use: 1,920 SF of B Use Group & 3,840 SF of S-1 Use Group.) Building includes offices, restrooms, ready/break room, storage bays, connection to city water, septic/sand filter system, electrical, data, lighting, HVAC, man doors, overhead doors, concrete floor, concrete approach aprons, and perimeter concrete sidewalks. Alternate Bid G-1 includes demolition of the existing storage building. (D6610) Alternate Bid G-4 includes additional 30’x80’ concrete approach apron.
Posted Date
-
Due Date
Nov 25, 2025
Illinois Capital Development Board
Close: Nov 25, 2025
Construction of a 5,760 gross square foot pre-engineered metal clear-span combination Office/Storage building. (Mixed Use: 1,920 SF of B Use Group & 3,840 SF of S-1 Use Group.) Building includes offices, restrooms, ready/break room, storage bays, connection to city water, septic/sand filter system, electrical, data, lighting, HVAC, man doors, overhead doors, concrete floor, concrete approach aprons, and perimeter concrete sidewalks. Alternate Bid G-1 includes demolition of the existing storage building. (D6610) Alternate Bid G-4 includes additional 30’x80’ concrete approach apron.
Illinois Capital Development Board
Construct additions and buildings; interior and HVAC improvements.
Posted Date
-
Due Date
Nov 25, 2025
Illinois Capital Development Board
Close: Nov 25, 2025
Construct additions and buildings; interior and HVAC improvements.
Laredo Independent School District
Cold storage services.
Posted Date
Nov 19, 2025
Due Date
Dec 2, 2025
Release: Nov 19, 2025
Laredo Independent School District
Close: Dec 2, 2025
Cold storage services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →