Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DCAMM is soliciting bids to renovate the McCormack Building’s 400-square-foot Control Center to accommodate new building systems and security video walls. The project also renovates the IDF Center to store related equipment with wiring connecting the two rooms between floors, and work will be phased to permit continued operations. Filed sub-bids include HVAC and Electrical, and the general bid is due January 22, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DCAMM is soliciting bids to renovate the McCormack Building’s 400-square-foot Control Center to accommodate new building systems and security video walls. The project also renovates the IDF Center to store related equipment with wiring connecting the two rooms between floors, and work will be phased to permit continued operations. Filed sub-bids include HVAC and Electrical, and the general bid is due January 22, 2026.
Posted Date
-
Due Date
Jan 22, 2026
Premium
Access the largest public sector contact database
DCAMM is soliciting bids to renovate the McCormack Building’s 400-square-foot Control Center to accommodate new building systems and security video walls. The project also renovates the IDF Center to store related equipment with wiring connecting the two rooms between floors, and work will be phased to permit continued operations. Filed sub-bids include HVAC and Electrical, and the general bid is due January 22, 2026.
Design: Design equipment for two (2) new video wall systems. System Integration: Assemble and integrate new equipment at DWR facilities. DWR will remove any existing structures and prepare the work area for Contractor assembly, and DWR will provide installation of Contractor assembled equipment. Lighting and Audio Upgrades: Provide guidance and assembly of upgraded lighting and audio equipment in the control rooms to meet the needs of the new video wall systems. Documentation and Testing: Provide system documentation, conduct factory and on-site testing, and ensure full functionality of the installed systems. Warranty and Maintenance: Provide warranty, maintenance, and repair services for both new and existing video wall systems. Training: Provide training on the new video wall systems and as needed, on existing systems when components are replaced or upgraded.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
Design: Design equipment for two (2) new video wall systems. System Integration: Assemble and integrate new equipment at DWR facilities. DWR will remove any existing structures and prepare the work area for Contractor assembly, and DWR will provide installation of Contractor assembled equipment. Lighting and Audio Upgrades: Provide guidance and assembly of upgraded lighting and audio equipment in the control rooms to meet the needs of the new video wall systems. Documentation and Testing: Provide system documentation, conduct factory and on-site testing, and ensure full functionality of the installed systems. Warranty and Maintenance: Provide warranty, maintenance, and repair services for both new and existing video wall systems. Training: Provide training on the new video wall systems and as needed, on existing systems when components are replaced or upgraded.
AvailableWork consists of traffic management center video system upgrade. Six (6) additional complete dvled cabinets matching those provided as part of the video wall, including matching batch-sorted led pixel cards; one (1) additional dvled video wall controller and send box; one (1) critical spares kit for the jupiter catalyst xl video wall management system.
Posted Date
Oct 29, 2025
Due Date
Jan 5, 2026
Release: Oct 29, 2025
Close: Jan 5, 2026
Work consists of traffic management center video system upgrade. Six (6) additional complete dvled cabinets matching those provided as part of the video wall, including matching batch-sorted led pixel cards; one (1) additional dvled video wall controller and send box; one (1) critical spares kit for the jupiter catalyst xl video wall management system.
AvailableProvision of as-needed services for new and existing video wall systems, including design, system integration, lighting and audio upgrades, documentation, testing, warranty, maintenance, and training.
Posted Date
Dec 2, 2025
Due Date
Jan 27, 2026
Release: Dec 2, 2025
Close: Jan 27, 2026
Provision of as-needed services for new and existing video wall systems, including design, system integration, lighting and audio upgrades, documentation, testing, warranty, maintenance, and training.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis