Great Lakes Water Authority
Work includes approx 1,957 LF of 12" clean and cctv gravity mains; 1,957 LF of 12" CIPP (UV) gravity mains; 22 EA replace manhole frame, cover and steps; 150 LF of 12' reinforced spray lining. See attached file.
REQ- 0004588 - pub - CSO Outfall Rehabilitation Phase VI
zip
City of Richmond
Work includes 1 LS stormwater conveyance system; sormwater drainage from a 41 acre area and discharging it through a new stormwater collection pipeline to a new stormwater outfall.
Commerce Refuse-to-Energy Authority
This project will rehabilitate approximately 528 feet of 60- and 63-inch diameter reinforced concrete pipe siphon of the Joint Outfall F Unit 3A Trunk Sewer with cured-in-place pipe liner, rehabilitate approximately 4 siphon structures with a protective liner system, and all appurtenant work.
Rolling Creek Utility District
Work includes : sanitary sewer rehabilitation phase 1.
Release
Jun 16, 2025
Close
Nov 04, 2025