Retrieving RFP details
Release
Close
Metropolitan Council - Twin Cities
Qualified firms to provide architectural and engineering services for the design and construction of the new Crow River Water Resource Recovery Facility (WRRF) and for work needed at other Council facilities to include Program Administration, Preliminary Design, Final Design, Bid Phase Support, and Construction Phase Support.
City of Grand Rapids
Procurement of electrical switch gear for the replacement of north-south UV disinfection at the water resource recovery facility.
Heritage Ranch Community Services District
Construction of a new 0.24 million gallons per day (MGD) Average Dry Weather Flow (ADWF) Packaged Membrane Bioreactor (MBR) Treatment Facility with equalization and screening; Construction of a Packaged Sludge Dewatering Facilities; Construction of the Influent Pump Station and new Inlet from Pond 1; Electrical Service Upgrades; Installation of a Standby Generator; Instrumentation and Controls, SCADA; Construction of an Effluent Pump Station and Distribution System; Sewer Force Main Flow Bypassing; Testing and Commissioning; Yard Piping, Structural Concrete Slabs, and general Site Improvements.
Great Lakes Water Authority
Provide pump station 2 variable frequency drives (VFDs) upgrade at the water resource recovery facility, project includes replacement of sewage pump VFDs, rewinding of sewage pump motors, and electrical distribution system upgrades.
Release
Aug 27, 2025
Close
Nov 17, 2025