Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Cowlitz County
The Consolidated Diking Improvement District No. 3 seeks consulting firms for civil, geotechnical, and environmental engineering design and permitting for the Cowlitz River Levee Repair Project. The project involves developing and approving repair alternatives with the USACE, followed by design and permitting of the selected alternative. Construction is planned for Summer 2027.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Army Engineer District Alaska
River levee rehabilitation of damaged flood control works. The construction length is approx. 5,000 LF (LF).
Posted Date
Oct 28, 2025
Due Date
Dec 2, 2025
Release: Oct 28, 2025
U.S. Army Engineer District Alaska
Close: Dec 2, 2025
River levee rehabilitation of damaged flood control works. The construction length is approx. 5,000 LF (LF).
AvailableU.S. Army Engineer District Detroit
Provide levee repairs. Clear vegetation, install steel sheet piles, install earth anchors, and backfill/grade as shown on the plans. Excavated material will be reused onsite for backfill and grading. Demobilize when complete.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
U.S. Army Engineer District Detroit
Close: Dec 17, 2025
Provide levee repairs. Clear vegetation, install steel sheet piles, install earth anchors, and backfill/grade as shown on the plans. Excavated material will be reused onsite for backfill and grading. Demobilize when complete.
AvailableTerrebonne Levee and Conservation District
Project shall include rehabilitation of an existing earthen levee using hauled in borrow material. The project shall include raising a portion of the existing upper reach i levee to a target elevation of 15. 0'
Posted Date
Nov 12, 2025
Due Date
Dec 2, 2025
Release: Nov 12, 2025
Terrebonne Levee and Conservation District
Close: Dec 2, 2025
Project shall include rehabilitation of an existing earthen levee using hauled in borrow material. The project shall include raising a portion of the existing upper reach i levee to a target elevation of 15. 0'
AvailableLewis County Public Utility District 1
Provide excitation system, associated accessories including engineering delivery, training and commissioning.
Posted Date
Oct 1, 2025
Due Date
Nov 20, 2025
Release: Oct 1, 2025
Lewis County Public Utility District 1
Close: Nov 20, 2025
Provide excitation system, associated accessories including engineering delivery, training and commissioning.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis