Millard Public Schools
Temperature control system replacement.
Anoka-Hennepin Independent School District 11
Project consists of removing existing steam radiation and unit ventilators. Providing roof mounted energy recovery units with condensing units will be used to provide ventilation air to each space. The existing pneumatic temperature control system will be replaced with a direct digital control system. Architectural work to include acoustical ceiling panel replacement, floor polishing, light fixture replacement, marker board replacement, wall repair, wall painting, casework replacement, and patching required for Mechanical Work.
Vandalia Community Unit School District 203
Replacement of the existing HVAC control system.
Millard Public Schools
Project consists of the addition of a second redundant boiler and accessories to the existing boiler plant.
Release
Oct 23, 2025
Close
Nov 18, 2025