Retrieving RFP details
Release
Close
Manatee County
Qualified firms for the provision of construction phase geotechnical engineering, soils & materials testing. Consultant shall provide all labor (note: the county does not pay overtime), materials, equipment, supplies and travel to perform the construction phase geotechnical engineering services to include: 1. Soils testing; 2. Materials testing; 3. Hydrological testing; 4. Asphalt paving reports; 5. Drill shaft testing; 6. Field sampling and testing; 7. Laboratory testing; 8. Geotechnical engineering services; 9. Perform all the services in accordance with generally accepted geotechnical engineering professional standards.
25-R088461JH Request for Qualifications
Idaho Transportation Department
Provide construction engineering, inspection, materials testing and project close-out services.
City of Crestview
Project consists of approx 413 TN of asphalt pavemnet; 940 SY of base; 387 LF pipe (storm); 1552 LF curb & 4 inlets.
City of Bonney Lake
Replacement of approx. 203 LF of 8" PVC sewer main on 77th Street Court East, reconnecting of side sewers, water service replacement and hot mix asphalt surface restoration; as well as repairs of a damaged 8" PVC sewer main on 205th Avenue by replacing approx. 14 LF of the sewer main and reconnecting a 6" sewer side service.
Release
Oct 01, 2025
Close
Nov 06, 2025