Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Nash Community College
Nash Community College is soliciting construction of a new approximately 2,300 sq ft Driver Training Pavilion with drive-through garage bays, including electrical, mechanical, and minimal plumbing. Bids are for a single prime contract; a pre-bid meeting is scheduled and proposals are due December 18, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Nash Community College
Furnishing of labor, material and equipment entering into the construction of the driver training pavilion.
Posted Date
-
Due Date
Dec 18, 2025
Release: -
Nash Community College
Close: Dec 18, 2025
Furnishing of labor, material and equipment entering into the construction of the driver training pavilion.
AvailableArlington County
Seeking a qualified contractor to furnish all labor, materials, and equipment for the construction services of a sidewalk widening project in between langston blvd wbl and ebl along ft myer dr. This includes work over top of the i-66 tunnel, which requires a non-standard sidewalk section shown in the details (the project). The project will include at the intersection of ft myer drive and langston blvd ebl new curb ramps on three corners. There will be two new curb inlets installed to replace two existing structures that are then converted to manholes. There will be a short run of proposed storm sewer to connect one of the new curb inlets. This intersection will also have two new traffic signal poles and the accompanying infrastructure related to them. The project will include traffic signal work at the intersection of n nash st and langston blvd ebl - three new traffic signal poles and pedestrian poles, among other signal infrastructure.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
Arlington County
Close: Dec 9, 2025
Seeking a qualified contractor to furnish all labor, materials, and equipment for the construction services of a sidewalk widening project in between langston blvd wbl and ebl along ft myer dr. This includes work over top of the i-66 tunnel, which requires a non-standard sidewalk section shown in the details (the project). The project will include at the intersection of ft myer drive and langston blvd ebl new curb ramps on three corners. There will be two new curb inlets installed to replace two existing structures that are then converted to manholes. There will be a short run of proposed storm sewer to connect one of the new curb inlets. This intersection will also have two new traffic signal poles and the accompanying infrastructure related to them. The project will include traffic signal work at the intersection of n nash st and langston blvd ebl - three new traffic signal poles and pedestrian poles, among other signal infrastructure.
AvailableCity of Livonia
Construction of a new pavilion with restrooms and storage at rotary park.
Posted Date
Nov 12, 2025
Due Date
Dec 9, 2025
Release: Nov 12, 2025
City of Livonia
Close: Dec 9, 2025
Construction of a new pavilion with restrooms and storage at rotary park.
AvailableWashington Suburban Sanitary Commission (WSSC)
Owner is seeking to establish a time and materials contract for the construction of a Garage. The new construction will consist of a jet truck garage housing six (6) CCTV/jet trucks, outdoor receptacles adjacent to the garage for three (3) CCTV trucks, and a parking area for three (3) CCTV/jet trucks. The garage will keep the trucks with temperatures above 50 degrees Fahrenheit during the winter months and will avoid any future issue on the trucks. Temple Hills Jet Truck Garage Construction. Project work includes: 1. New pre-engineered metal building structure and enclosure. The building is approx 5,500 SF (one story) to accommodate six truck bays. 2. New concrete foundations and slab-on-grade for the pre-engineered building. 3. New doors, frames, and hardware. 4. New fire extinguishers and bollards. 5. New HVAC equipment, unit heaters, exhaust fans, and air louvers with dampers. 6. New indoor light fixtures, exit signs, outdoor wall packs and pole light. 7. New transformer, electrical panels, conduit from main building, wiring, and services. 8. Three new outdoor parking spaces with receptacles for CCTV trucks. 9. Sitework, including utilities, grading, paving, stormwater management, and landscaping.
Posted Date
Nov 18, 2025
Due Date
Dec 18, 2025
Release: Nov 18, 2025
Washington Suburban Sanitary Commission (WSSC)
Close: Dec 18, 2025
Owner is seeking to establish a time and materials contract for the construction of a Garage. The new construction will consist of a jet truck garage housing six (6) CCTV/jet trucks, outdoor receptacles adjacent to the garage for three (3) CCTV trucks, and a parking area for three (3) CCTV/jet trucks. The garage will keep the trucks with temperatures above 50 degrees Fahrenheit during the winter months and will avoid any future issue on the trucks. Temple Hills Jet Truck Garage Construction. Project work includes: 1. New pre-engineered metal building structure and enclosure. The building is approx 5,500 SF (one story) to accommodate six truck bays. 2. New concrete foundations and slab-on-grade for the pre-engineered building. 3. New doors, frames, and hardware. 4. New fire extinguishers and bollards. 5. New HVAC equipment, unit heaters, exhaust fans, and air louvers with dampers. 6. New indoor light fixtures, exit signs, outdoor wall packs and pole light. 7. New transformer, electrical panels, conduit from main building, wiring, and services. 8. Three new outdoor parking spaces with receptacles for CCTV trucks. 9. Sitework, including utilities, grading, paving, stormwater management, and landscaping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis