Retrieving RFP details
Release
Close
City of Fayetteville
Work consist of 400 CY of rock excavation, 4384 LF of 10" PVC dr-14 force main, 3 ea of 2" air release valve, 131 LF of 8" DI iron pipe, 643 LF of 8" PVC pipe, 1730 LF of 12" PVC pipe, 3480 LF of 15" PVC pipe, 2 EA of rehabilitate existing manhole, 25 EA of 4' dia manhole, 133 SY of remove & replace concrete trail, 259 SY of remove & replace concrete pavement, 30 SY of remove & replace gravel pavement, 194 SY of remove & replace asphalt pavement, 255 SF of remove & replace curb & gutter. See outside link.
Turtle Mountain Band of Chippewa Indians
Construction of BIA 10 and green acres sewer and lift station improvements.
Lake Stevens Sewer District
Work includes construct the lift station generator improvements. The scope of work for this project includes modifications to five small, separate lift stations within the sewer district service area. These lift stations are station 2, 3, 4, 5, and 6. Work at lift station 2 (schedule a) includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, electrical modifications, and installation of a new, larger electrical service. Work at lift station 3 (schedule b) includes demolition of existing generator equipment, procurement and installation of a new diesel generator with custom subbase fuel tank, modifications to the existing cmu building, and electrical modifications. Work at lift station 4 (schedule c) Includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, and electrical modifications. Work at lift station 5 (schedule d) includes demolition of an existing fuel tank and accompanying building, procurement and installation of a new diesel generator with subbase fuel tank, modifications to the existing concrete roof slab, site and concrete work, and electrical modifications.
City of Emporia
Construction of new 72" diameter wet well with wet well mounted duplex lift station, demolition of existing vacuum prime lift station. Site improvements including gravel surfacing, concrete pavement, and chain link security fence.
Release
Oct 05, 2025
Close
Nov 06, 2025