Retrieving RFP details
Release
Close
California Department of Transportation
Work consists of construct curb ramps & sw, ret wall, and install signal & lighting system, include 150 SF of temporary pavement marking (paint); 620 LF of temporary barrier system; 330 LF of temporary fiber roll; 730 LF of remove yellow painted traffic stripe (hazardous waste); 720 CY of roadway excavation; 320 sy of subgrade enhancement geotextile, class b2; 470 LF of fiber rolls; 300 CY of class 2 aggregate base; 190 ton of hot mix asphalt (type a); 305 SF of retaining wall; 260 LF of 18" alternative pipe culvert; 110 LF of remove culvert; 100 CY of minor concrete (curb, gutter, sidewalk and driveway); 1,000 SF of thermoplastic pavement marking; 1,370 LF of 6" thermoplastic traffic stripe (enhanced wet night visibility); 570 SF of remove thermoplastic pavement marking. See outside link.
Construct Curb Ramps & SW, Ret Wall, and Install Signal & Lighting System
zip
California Department of Transportation
Modify signal & lighting, and construct ADA ramps.
California Department of Transportation
Culvert restoration, install curb ramps, guardrail, & HMA-A
North Dakota Department of Transportation
Work includes PCC pavement, curb & gutter, curb ramps, street lighting, traffic signal, signing and pavement marking. Includes 1 LS removal of trees & brush; 859 SY removal of concrete pavement; 1343 LF removal of curb & gutter; 408 SY sod; 1728 ton aggregate base course cl 5; 883 SY 8" non-reinf concrete pavement cl ae-doweled; see attached files.
Release
Oct 13, 2025
Close
Nov 19, 2025