North Dakota Department of Transportation
Work includes PCC pavement, curb & gutter, curb ramps, street lighting, traffic signal, signing and pavement marking. Includes 1 LS removal of trees & brush; 859 SY removal of concrete pavement; 1343 LF removal of curb & gutter; 408 SY sod; 1728 ton aggregate base course cl 5; 883 SY 8" non-reinf concrete pavement cl ae-doweled; see attached files.
23645, HEU-1-981(134) - PCC Pavement, Curb & Gutter, Curb Ramps, Street Lighting - (RFP)
zip
North Dakota Department of Transportation
Work includes 80 SY removal of concrete pavement; 38 LF removal of curb & gutter; 965 SY seeding class III; 965 SY hydraulic mulch; 210 LF fiber rolls 12in; 97 ton aggregate base course cl 5; 1 LS mobilization; 434 unit traffic control signs; 3 EA sidewalk barricade; 62 LF pedestrian walkway, see attached files.
Michigan Department of Technology, Management and Budget
Work includes 0. 30 mi of concrete sidewalk and ramps, concrete curb and gutter, pedestrian refuge, hot mix asphalt hand patching, and permanent pavement markings that also includes 9 EA culv, rem, less than 24 inch; 610 LF curb and gutter, rem; 282 SY pavt, rem; 53 SY sidewalk, rem; 1,150 CY excavation, earth; 500 LF erosion control, silt fence; 250 LF sewer, cl a, perforated slcpp w\sock, 12 inch, tr det b, modifed. See attached file.
Michigan Department of Technology, Management and Budget
0.62 mi of hot mix asphalt reconstruction, concrete curb, gutter and sidewalk ramps and pavement markings.
Release
Oct 20, 2025
Close
Nov 14, 2025