Retrieving RFP details
Release
Close
Pasco County
Construction of additional left and right turn lanes.
Collier Parkway At Livingston Road Intersection Improvements
zip
City of Richardson
Work includes Traffic Signals, paving, signing & striping, and ADA ramps. 415 CY Excavation(Roadway; 185 SY Block sodding; 382 SY Concrete Sidewalks(6");
Virginia Department of Transportation
Perform intersection improvements which include traffic control (detour), milling, paving, installation of a directional island, signage, and lane markers.
Hinds County
Work includes installation of 107 double arm electrical lighting pole assembly, 40' high and spaced at approximately 154' apart within the median of the parkway, installation of 2 single arm electrical lighting pole assembly, 40' high.
Release
Sep 26, 2025
Close
Oct 28, 2025