City of Charlotte
Work includes installation of approx 26 LF 30" RCP, 90 LF 36" RCP, 110 LF 29x45 elliptical pipe; 7 LF 24" RCP, 77 LF 15" RCP, 29 LF 15" RCP class IV, approx 26 LF of 30" RCP, 56 LF 15" RCP, 10 LF 36" RCP, 200 LF of RCP is to be plugged and abandoned, replace approx 105 LF of sewer with 8" DIP and replace (2) sewer manholes, Storm drainage structure replacement, foundation protection, asphalt resurfacing and curb and gutter replacement, removal of approx 75 LF of duel 60" CMP and installation of 65 LF of a 10x5 RCBC, R&R 54 LF 6" water main, approx 314 LF of sewer replacement and (6) MHs, concrete headwalls, riprap, and full depth pavement resurfacing.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Charlotte
Work includes 4" DI sewer pipe, PC 350 352 LF, 6" DI sewer pipe, PC 350 17 LF, 8" DI sewer pipe, PC 350 171 LF, sanitary sewer cleanout 4 EA, sanitary sewer bypass pumping 10 DY, concrete thrust blocking 10 CY.
Posted Date
Nov 12, 2025
Due Date
Dec 9, 2025
Release: Nov 12, 2025
City of Charlotte
Close: Dec 9, 2025
Work includes 4" DI sewer pipe, PC 350 352 LF, 6" DI sewer pipe, PC 350 17 LF, 8" DI sewer pipe, PC 350 171 LF, sanitary sewer cleanout 4 EA, sanitary sewer bypass pumping 10 DY, concrete thrust blocking 10 CY.
AvailableGlynn County
Replacement of the existing storm drainage system. Identified in the attached plans. The work to be performed under this contract consists of furnishing all labor, equipment, materials/products and performing all project coordination necessary to replace the existing stormwater drainage system. The stormwater drainage improvement construction includes but is not limited to the removal and replacement of asphalt pavement, curb and gutter asphalt milling and removal and disposal of the existing storm system within the project limits as identified within the plans and includes installation of new concrete storm pipe structures and junctions as identified in the plans, Grassing and erosion control measures all work shall be in accordance with the technical specifications, special provisions and the construction drawings.
Posted Date
Nov 5, 2025
Due Date
Dec 5, 2025
Release: Nov 5, 2025
Glynn County
Close: Dec 5, 2025
Replacement of the existing storm drainage system. Identified in the attached plans. The work to be performed under this contract consists of furnishing all labor, equipment, materials/products and performing all project coordination necessary to replace the existing stormwater drainage system. The stormwater drainage improvement construction includes but is not limited to the removal and replacement of asphalt pavement, curb and gutter asphalt milling and removal and disposal of the existing storm system within the project limits as identified within the plans and includes installation of new concrete storm pipe structures and junctions as identified in the plans, Grassing and erosion control measures all work shall be in accordance with the technical specifications, special provisions and the construction drawings.
Borough of Chambersburg
Industrial drive storm sewer improvement project work involves the construction of storm sewer piping and associated improvements. Details have been provided in the bidding documents.
Posted Date
Nov 27, 2025
Due Date
Dec 8, 2025
Release: Nov 27, 2025
Borough of Chambersburg
Close: Dec 8, 2025
Industrial drive storm sewer improvement project work involves the construction of storm sewer piping and associated improvements. Details have been provided in the bidding documents.
AvailableTown of Argo
Work includes culvert replacement.
Posted Date
Nov 6, 2025
Due Date
Nov 24, 2025
Release: Nov 6, 2025
Town of Argo
Close: Nov 24, 2025
Work includes culvert replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis