Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of sewer and water infrastructure includes 63 CY borrow excavation (FME) contractor furnished class 9, 2,194 LF 8" sanitary sewer main SDR 26 0'-6', 472 LF 8" HDPE PE3408 sewer main (bored on grade), 1,896 LF 6" PVC sewer force main, 447 LF 8" HDPE PE3408 water main directional bore, 80 LF 12" PVC casing bored on grade.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide mowing highway right of way.
Posted Date
Nov 24, 2025
Due Date
Dec 18, 2025
Release: Nov 24, 2025
Close: Dec 18, 2025
Provide mowing highway right of way.
AvailablePremium
Access the largest public sector contact database
Project includes the relocation of gravity sewer.
Posted Date
Dec 8, 2025
Due Date
Jan 13, 2026
Release: Dec 8, 2025
Close: Jan 13, 2026
Project includes the relocation of gravity sewer.
AvailableProvide pavement striping, roadway markings, and curb painting services. Enhance roadway visibility, promote traffic safety, and ensure compliance with state and local standards. Work will include removal and surface preparation of existing striping or pavement markings where applicable, followed by installation of reflective pavement markers (rpms). Temporary traffic control and signage shall be provided in accordance with the ca mutcd to safely manage traffic along these arterials during construction. Perform all work and appropriate mobilization and staging along the project limits, and shall complete site cleanup and debris removal upon completion of each work segment. See outside link.
Posted Date
-
Due Date
Dec 22, 2025
Close: Dec 22, 2025
Provide pavement striping, roadway markings, and curb painting services. Enhance roadway visibility, promote traffic safety, and ensure compliance with state and local standards. Work will include removal and surface preparation of existing striping or pavement markings where applicable, followed by installation of reflective pavement markers (rpms). Temporary traffic control and signage shall be provided in accordance with the ca mutcd to safely manage traffic along these arterials during construction. Perform all work and appropriate mobilization and staging along the project limits, and shall complete site cleanup and debris removal upon completion of each work segment. See outside link.
AvailableProvide pavement striping, roadway markings, and curb painting services. Enhance roadway visibility, promote traffic safety, and ensure compliance with state and local standards. Work will include removal and surface preparation of existing striping or pavement markings where applicable, followed by installation of reflective pavement markers (rpms). Temporary traffic control and signage shall be provided in accordance with the ca mutcd to safely manage traffic along these arterials during construction. Perform all work and appropriate mobilization and staging along the project limits, and shall complete site cleanup and debris removal upon completion of each work segment. See outside link.
Posted Date
-
Due Date
Dec 22, 2025
Close: Dec 22, 2025
Provide pavement striping, roadway markings, and curb painting services. Enhance roadway visibility, promote traffic safety, and ensure compliance with state and local standards. Work will include removal and surface preparation of existing striping or pavement markings where applicable, followed by installation of reflective pavement markers (rpms). Temporary traffic control and signage shall be provided in accordance with the ca mutcd to safely manage traffic along these arterials during construction. Perform all work and appropriate mobilization and staging along the project limits, and shall complete site cleanup and debris removal upon completion of each work segment. See outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis