Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
National Guard Bureau (NGB)
Work includes installation of guardrail transitions, earth pads for guardrail end treatments, guardrail delineation enhancements, W-beam guardrails, and energy-absorbing guardrail terminals; removal of existing guardrails; implementation of traffic control; removal and installation of delineators and roadside obstacle delineation; sign post delineation enhancements; placement of "U" section steel posts, perforated/knockout square tube posts, and P-post slip bases; installation of flat sheet aluminum signs of varying thicknesses; removal of signs, supports, and footings; installation of railroad advance warning signs and supports; placement and lens replacement of snowplowable raised pavement markers; plastic pavement markings including channelization striping, stop lines, turn lane arrows, barrier lines, crosswalks, RXR words, yield lines, and noise strips; removal of word pavement markings; application of spray thermoplastic pavement markings for 4-inch lines and 4-inch dotted lines; mobilization; and installation of flashing warning beacons.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
New York State Thruway Authority
Provide 2" mill and inlay, safety improvements and miscellaneous work that also includes provide basic work zone traffic control according to contract documents and as ordered by the engineer. Perform full/partial depth pavement repairs as indicated in the contract documents and as ordered by the engineer between milepost 76.5 to 86.8. Perform 2" mill and inlay of the asphalt mainline between mp 76.5 and mp 86.8 including u-turns and their deceleration lanes. Installation/replacement of temporary and permanent pavement markings removed by pavement resurfacing. Replacement of miards removed by pavement resurfacing. Repair culvert end section at mp 76.76 and clean and shape ditch at mp 80.25 and mp 81.60. Perform safety improvements as indicated in the contract documents. See attached file.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
New York State Thruway Authority
Close: Dec 17, 2025
Provide 2" mill and inlay, safety improvements and miscellaneous work that also includes provide basic work zone traffic control according to contract documents and as ordered by the engineer. Perform full/partial depth pavement repairs as indicated in the contract documents and as ordered by the engineer between milepost 76.5 to 86.8. Perform 2" mill and inlay of the asphalt mainline between mp 76.5 and mp 86.8 including u-turns and their deceleration lanes. Installation/replacement of temporary and permanent pavement markings removed by pavement resurfacing. Replacement of miards removed by pavement resurfacing. Repair culvert end section at mp 76.76 and clean and shape ditch at mp 80.25 and mp 81.60. Perform safety improvements as indicated in the contract documents. See attached file.
AvailableNational Guard Bureau (NGB)
Work includes installation of earth pads for Type 38 guardrail end treatments, guardrail delineation enhancements, W-beam guardrails, tangent energy-absorbing terminals, removal of existing guardrail, traffic control, roadside obstacle delineation, sign post delineation enhancements, installation of steel and perforated/knockout posts, flat sheet aluminum signs, removal of signs with supports and footings, railroad advance warning signs and supports, snowplowable raised pavement markers, plastic and painted pavement markings including stop lines, RXR symbols, and various line types, spray thermo pavement markings, and mobilization.
Posted Date
-
Due Date
Dec 5, 2025
National Guard Bureau (NGB)
Close: Dec 5, 2025
Work includes installation of earth pads for Type 38 guardrail end treatments, guardrail delineation enhancements, W-beam guardrails, tangent energy-absorbing terminals, removal of existing guardrail, traffic control, roadside obstacle delineation, sign post delineation enhancements, installation of steel and perforated/knockout posts, flat sheet aluminum signs, removal of signs with supports and footings, railroad advance warning signs and supports, snowplowable raised pavement markers, plastic and painted pavement markings including stop lines, RXR symbols, and various line types, spray thermo pavement markings, and mobilization.
National Guard Bureau (NGB)
Work includes guardrail delineation enhancements, traffic control, installation of flexible white delineators, sign post delineation enhancements, steel and perforated/knockout posts, flat sheet aluminum signs, removal of signs with supports and footings, railroad cross-buck signs and supports, railroad advance warning signs and supports, plastic pavement markings including channelization striping, stop lines, turn lane arrows, barrier lines, longitudinal cross-walks, RXR symbols, yield lines, spray thermo pavement markings with solid and dotted lines, and mobilization.
Posted Date
-
Due Date
Dec 5, 2025
National Guard Bureau (NGB)
Close: Dec 5, 2025
Work includes guardrail delineation enhancements, traffic control, installation of flexible white delineators, sign post delineation enhancements, steel and perforated/knockout posts, flat sheet aluminum signs, removal of signs with supports and footings, railroad cross-buck signs and supports, railroad advance warning signs and supports, plastic pavement markings including channelization striping, stop lines, turn lane arrows, barrier lines, longitudinal cross-walks, RXR symbols, yield lines, spray thermo pavement markings with solid and dotted lines, and mobilization.
Town of Arlington
Work includes sr-205 repairs and safety improvements.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
Town of Arlington
Close: Dec 15, 2025
Work includes sr-205 repairs and safety improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis