Retrieving RFP details
Release
Close
Tohopekaliga Water Authority
Provide pre-construction services and a Guaranteed Maximum Price (GMP) with full disclosure of actual costs to TOHO for the project. Preconstruction responsibilities include, but are not limited to value engineering, construction cost estimating, constructability reviews, associated meetings and conferences, and open-book GMP development. Additionally, the successful respondents shall provide construction phase services, consisting of, but not limited to, administrative services, procurement, construction management, scheduling, supervision and accepted accounting principles throughout the complete project. The existing WRF has a permitted capacity of 3.0 million gallons per day (MGD) annual average flow (AADF) and utilizes Modified Ludzack–Ettinger (MLE) process for biological nutrient removal. The project will modify the biological nutrient removal (BNR) process by adding new baffle walls, mixers, new internal recycle (IR) pumps, air pipe modifications, reconfigurations of existing aeration basins, and a new chemical feed and storage to meet AWT standards. In addition, the project will include a new mechanical screen, pretreatment concrete and protective coating repairs at the headworks, a new odor control system, disc filter replacement, reject pond liner repairs, construction of a metal storage building, and installation of a new generator.
RFQu-25-014 - pub - Lake Marion Water Reclamation Racility (
zip
City of Webster City
The Webster City Wastewater Treatment Plant Improvements project generally includes the construction of a new SBR wastewater treatment facility adjacent to the existing wastewater treatment plant including improvements at the headworks, digesters, the electrical and control systems; renovation or construction of office and laboratory; and miscellaneous building repairs and improvements.\r \r SCOPE OF SERVICES\r The CMAR along with the Owner, Architect and Engineer (A/E) Teams will be a critical member of the project team, providing services prior to the start of construction through final acceptance and project closeout. The CMAR services are briefly outlined below for pre-construction, construction, and post construction.: \r 1.Pricing, phasing, and constructability reviews for construction. \r 2.Pre-construction services, including cost estimating and bidding services. \r 3.Construction Manager at Risk of approved scope of work. \r 4.Solicitation of subcontractors pursuant to Iowa Code 26A. \r 5.Other pertinent information and required services to complete work.
City of Greensboro
Provide design-build services for the townsend water treatment plant advanced treatment facility project.
Emmetsburg Municipal Utilities Board
Emmetsburg Municipal Utilities (EMU) will be publishing a request for statements of qualifications (RFQs) for Construction Manager at Risk (CMAR) services to provide Construction services for Water Treatment Facility Improvements. The Project will consist of improvements to the existing Water Treatment Facility consisting of: Existing pressure filter rehabilitation; Cast in place concrete storage tanks; Precast concrete building; Reverse osmosis (RO) equipment; Site work; Process pumps, piping, and electrical; Backwash waste tank conversion into a lift station and forcemain; New supply well with submersible pump.
Release
Oct 19, 2025
Close
Nov 20, 2025