Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide cleaning and disposal of waste from sanitary lift stations and sewer lines.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement for cleaning and disposal of waste from sanitary lift stations and sewer lines at John F. Kennedy International Airport under a two-year contract.
Posted Date
-
Due Date
Dec 29, 2025
Close: Dec 29, 2025
Procurement for cleaning and disposal of waste from sanitary lift stations and sewer lines at John F. Kennedy International Airport under a two-year contract.
AvailableThis solicitation is a rebid for a two‑year service contract to clean and dispose of waste from sanitary lift stations and sewer lines at John F. Kennedy International Airport. The Port Authority of New York and New Jersey is issuing the RFB and has posted an addendum, requiring sealed responses submitted through the Bonfire portal. The opportunity is currently open with a pre‑bid meeting scheduled and a firm submission deadline of December 29, 2025.
Posted Date
Dec 15, 2025
Due Date
Dec 29, 2025
Release: Dec 15, 2025
Close: Dec 29, 2025
This solicitation is a rebid for a two‑year service contract to clean and dispose of waste from sanitary lift stations and sewer lines at John F. Kennedy International Airport. The Port Authority of New York and New Jersey is issuing the RFB and has posted an addendum, requiring sealed responses submitted through the Bonfire portal. The opportunity is currently open with a pre‑bid meeting scheduled and a firm submission deadline of December 29, 2025.
AvailableScope of this project consists primarily of installing emergency generators, including supporting infrastructure, at existing sanitary sewer lift stations.
Posted Date
Aug 13, 2025
Due Date
Jan 6, 2026
Release: Aug 13, 2025
Close: Jan 6, 2026
Scope of this project consists primarily of installing emergency generators, including supporting infrastructure, at existing sanitary sewer lift stations.
AvailableThis project includes improvements to the existing duplex lift station serving the Boeing Maintenance Facility. Upgrades to the lift station include replacing both pumps and pump controls, other miscellaneous equipment, the existing equipment access hatch, and adding a flow meter and structure. Also included is the rehabilitation of portions of the storm sewer system using trenchless technologies such as cured-in-place-pipe (CIPP) lining, root cutting, and heavy cleaning for the sewer pipes. Rehabilitation of the affected storm sewer structures includes cleaning inlets and pipe end sections, replacing inlet lids and broken end sections, and installation of trash racks in end sections. Additionally, the rehabilitation of portions of the sanitary sewer system using cured-in-place-pipe (CIPP) lining, Point Repair, and Trenchless CIPP Point Liner is included. Rehabilitation of the affected sanitary sewer structures includes manhole lining and replacing manhole steps.
Posted Date
Oct 20, 2025
Due Date
Jan 8, 2026
Release: Oct 20, 2025
Close: Jan 8, 2026
This project includes improvements to the existing duplex lift station serving the Boeing Maintenance Facility. Upgrades to the lift station include replacing both pumps and pump controls, other miscellaneous equipment, the existing equipment access hatch, and adding a flow meter and structure. Also included is the rehabilitation of portions of the storm sewer system using trenchless technologies such as cured-in-place-pipe (CIPP) lining, root cutting, and heavy cleaning for the sewer pipes. Rehabilitation of the affected storm sewer structures includes cleaning inlets and pipe end sections, replacing inlet lids and broken end sections, and installation of trash racks in end sections. Additionally, the rehabilitation of portions of the sanitary sewer system using cured-in-place-pipe (CIPP) lining, Point Repair, and Trenchless CIPP Point Liner is included. Rehabilitation of the affected sanitary sewer structures includes manhole lining and replacing manhole steps.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis