Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
IDOT is soliciting bids to perform Class B concrete pavement patches along IL 5 at 16th Street in Moline, Illinois, with approximately 560 feet of associated resurfacing. The scope includes hot-mix asphalt surface removal and replacement, curb and gutter removal and replacement in a small quantity, pavement markings, and traffic control. Work is in Rock Island County under a 25 working day contract.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
IDOT is soliciting bids to perform Class B concrete pavement patches along IL 5 at 16th Street in Moline, Illinois, with approximately 560 feet of associated resurfacing. The scope includes hot-mix asphalt surface removal and replacement, curb and gutter removal and replacement in a small quantity, pavement markings, and traffic control. Work is in Rock Island County under a 25 working day contract.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
IDOT is soliciting bids to perform Class B concrete pavement patches along IL 5 at 16th Street in Moline, Illinois, with approximately 560 feet of associated resurfacing. The scope includes hot-mix asphalt surface removal and replacement, curb and gutter removal and replacement in a small quantity, pavement markings, and traffic control. Work is in Rock Island County under a 25 working day contract.
Premium
Access the largest public sector contact database
IDOT is soliciting bids for a highway resurfacing project on IL 32 covering 3.1 miles from the Shelby County line to IL 33 in Effingham County, Illinois. The project will be let as part of the statewide January 16, 2026 letting. Plans and special provisions have not yet been published on the contract page at the time of review.
Posted Date
Nov 19, 2025
Due Date
Jan 16, 2026
Release: Nov 19, 2025
Close: Jan 16, 2026
IDOT is soliciting bids for a highway resurfacing project on IL 32 covering 3.1 miles from the Shelby County line to IL 33 in Effingham County, Illinois. The project will be let as part of the statewide January 16, 2026 letting. Plans and special provisions have not yet been published on the contract page at the time of review.
AvailableIllinois Department of Transportation is letting Contract 187-66N78 for 5.8 miles of milling and resurfacing (designed overlay) on IL 29/26 and SBI 29 in Bureau County. The project includes ditch cleaning, pipe culvert replacement, guardrail as applicable, pavement marking, and raised reflective pavement markers. Work limits span FAS 318 (IL 29), SBI 29 A (IL 29), and FAS 2245 (IL 29/26), from the Putnam County line to south of Kansas St. in Bureau Junction, plus SBI 29 (OR 29) from IL 29 to dead end.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
Illinois Department of Transportation is letting Contract 187-66N78 for 5.8 miles of milling and resurfacing (designed overlay) on IL 29/26 and SBI 29 in Bureau County. The project includes ditch cleaning, pipe culvert replacement, guardrail as applicable, pavement marking, and raised reflective pavement markers. Work limits span FAS 318 (IL 29), SBI 29 A (IL 29), and FAS 2245 (IL 29/26), from the Putnam County line to south of Kansas St. in Bureau Junction, plus SBI 29 (OR 29) from IL 29 to dead end.
AvailableThe Illinois Department of Transportation is soliciting bids for 2.7 miles of resurfacing on Andrew Road from 0.1 miles east of IL 29 to west of IL 124, west of Sherman in Sangamon County. The contract will be bid at the January 16, 2026 letting. Plans and special provisions are posted in the IDOT ePlan portal associated with this contract.
Posted Date
Nov 18, 2025
Due Date
Jan 16, 2026
Release: Nov 18, 2025
Close: Jan 16, 2026
The Illinois Department of Transportation is soliciting bids for 2.7 miles of resurfacing on Andrew Road from 0.1 miles east of IL 29 to west of IL 124, west of Sherman in Sangamon County. The contract will be bid at the January 16, 2026 letting. Plans and special provisions are posted in the IDOT ePlan portal associated with this contract.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis