Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Dallas (Dallas Water Utilities) is soliciting proposals for Improvement Component 1, Work Package 2 at the Elm Fork Water Treatment Plant, covering the reroute of the thickened residuals sludge line. The scope includes installation of yard piping, utility support, tie-in coordination, and concrete pavement replacement per contract documents and delineation drawings. Information and plan distribution are also referenced on the CMARs CivCast page, but submissions are via the Citys Bonfire portal by the stated deadline.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Dallas (Department of Water Utilities) issued an RFP for construction/design work titled "DWU Elm Fork WTP WQIP - IC1 - WP - Thickened Residuals Sludge Line Reroute," covering installation of yard piping, utility support, tie-ins, and concrete replacement as part of Work Package IC1. The opportunity is posted on the City of Dallas Bonfire procurement portal and lists a required proposal upload (PDF) and an Excel pricing response template. The posting is open with submission instructions and supporting documents available through the Bonfire portal (login required).
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
The City of Dallas (Department of Water Utilities) issued an RFP for construction/design work titled "DWU Elm Fork WTP WQIP - IC1 - WP - Thickened Residuals Sludge Line Reroute," covering installation of yard piping, utility support, tie-ins, and concrete replacement as part of Work Package IC1. The opportunity is posted on the City of Dallas Bonfire procurement portal and lists a required proposal upload (PDF) and an Excel pricing response template. The posting is open with submission instructions and supporting documents available through the Bonfire portal (login required).
AvailableWork package 2 is exclusively for the thickend residuals sludge line reroute (18" sludge reroute) as identified further in the proposal form in project documents.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
Work package 2 is exclusively for the thickend residuals sludge line reroute (18" sludge reroute) as identified further in the proposal form in project documents.
AvailableThe City of Dallas issued an RFP for the DWU Elm Fork Water Treatment Plant (WTP) WQIP Improvement Component 1 (IC1) work package covering the Filter Flume, Junction Box and Access Building and related yard piping, mechanical and electrical infrastructure. The work package is part of a larger WQIP and references additional elements (thickened residuals sludge line and backwash tanks) and the Construction Manager at Risk (Archer Western Construction) procurement site (CivCast) for more project-level information. Submissions are due Dec 17, 2025 at 2:00 PM CST and the opportunity was posted on the City of Dallas Bonfire portal on Nov 12, 2025 (open and accepting proposals).
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Close: Dec 17, 2025
The City of Dallas issued an RFP for the DWU Elm Fork Water Treatment Plant (WTP) WQIP Improvement Component 1 (IC1) work package covering the Filter Flume, Junction Box and Access Building and related yard piping, mechanical and electrical infrastructure. The work package is part of a larger WQIP and references additional elements (thickened residuals sludge line and backwash tanks) and the Construction Manager at Risk (Archer Western Construction) procurement site (CivCast) for more project-level information. Submissions are due Dec 17, 2025 at 2:00 PM CST and the opportunity was posted on the City of Dallas Bonfire portal on Nov 12, 2025 (open and accepting proposals).
Work package 1 is exclusively for the filter flume, junction box and access building as identified further in the proposal form in project documents.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Close: Dec 17, 2025
Work package 1 is exclusively for the filter flume, junction box and access building as identified further in the proposal form in project documents.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis