Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Parkersburg
1. Removal of Existing Concrete Sidewalk; Remove existing concrete sidewalk. 2. Installation of Decorative Bin Block Wall; Construct new decorative bin block retaining wall. 3. Installation of New Perimeter Sidewalk; Install new perimeter sidewalk. 4. Installation of New Connector Sidewalks; Install connector sidewalks as shown on plans to tie into existing walkways. Add Alternate No. 1 Remove approx. 2 feet of material from the pond bottom. Transport all removed material to Mount Olivet Cemetery, to the designated field area parallel with 23rd Street. Seed and straw all transported material to restore disturbed areas. The City of Parkersburg will drain the pond prior to commencement of this work. Add Alternate No. 2 Installation of a stormwater retention system at the corner of 23rd Street and Park Avenue.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Hammond
Work includes clearing and grubbing, site grading, the construction of a berm around the pond, installation of a pond liner, install a new well, and install a water control outlet structure with new sewer pipe.
Posted Date
Oct 31, 2025
Due Date
Nov 19, 2025
Release: Oct 31, 2025
City of Hammond
Close: Nov 19, 2025
Work includes clearing and grubbing, site grading, the construction of a berm around the pond, installation of a pond liner, install a new well, and install a water control outlet structure with new sewer pipe.
AvailableNew Castle Conservation District
Construct a stormwater pond. See attached files.
Posted Date
Nov 12, 2025
Due Date
Dec 16, 2025
Release: Nov 12, 2025
New Castle Conservation District
Close: Dec 16, 2025
Construct a stormwater pond. See attached files.
AvailableTown of Darien
Seeking qualified independent contractors for the permitting and dredging of two (2) ponds. Clean and remove leaves, brush, small branches, dead and fallen trees, dead vegetation, and sediment. Hydraulically dredge an estimated 4,400 cubic yards from the primary and upstream catch pond. Remove fallen woody debris from the ponds as needed. Dispose of dredge spoils, regrade as necessary, and hydroseed to repair the lawn. Hydraulically dredge an estimated 2,000 cubic yards from the pond. Remove fallen woody debris from the pond as needed. Dispose of dredge spoils, regrade as necessary, and hydroseed to repair the lawn. See outside link.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
Town of Darien
Close: Dec 4, 2025
Seeking qualified independent contractors for the permitting and dredging of two (2) ponds. Clean and remove leaves, brush, small branches, dead and fallen trees, dead vegetation, and sediment. Hydraulically dredge an estimated 4,400 cubic yards from the primary and upstream catch pond. Remove fallen woody debris from the ponds as needed. Dispose of dredge spoils, regrade as necessary, and hydroseed to repair the lawn. Hydraulically dredge an estimated 2,000 cubic yards from the pond. Remove fallen woody debris from the pond as needed. Dispose of dredge spoils, regrade as necessary, and hydroseed to repair the lawn. See outside link.
Town of Greenwich
Maintenance dredging of sediment forebays at pond.
Posted Date
Nov 5, 2025
Due Date
Nov 26, 2025
Release: Nov 5, 2025
Town of Greenwich
Close: Nov 26, 2025
Maintenance dredging of sediment forebays at pond.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis