Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Huntsville
Project consists of streets concrete and ada upgrades. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Huntsville
Project consists of streets resurfacing. See outside link.
Posted Date
Nov 13, 2025
Due Date
Nov 25, 2025
Release: Nov 13, 2025
City of Huntsville
Close: Nov 25, 2025
Project consists of streets resurfacing. See outside link.
AvailableCity of Helena
51 double ramp ADA corners, 37 single ramps, 2 sidewalk panels with truncated domes, 3 alley drive approaches with truncated domes on each side, and 2 valley gutters.
Posted Date
Oct 28, 2025
Due Date
Nov 20, 2025
Release: Oct 28, 2025
City of Helena
Close: Nov 20, 2025
51 double ramp ADA corners, 37 single ramps, 2 sidewalk panels with truncated domes, 3 alley drive approaches with truncated domes on each side, and 2 valley gutters.
AvailableProvidence Public School District
Phase III Lighting LED Upgrades Project at Nine Schools.
Posted Date
Aug 20, 2025
Due Date
Dec 19, 2025
Release: Aug 20, 2025
Providence Public School District
Close: Dec 19, 2025
Phase III Lighting LED Upgrades Project at Nine Schools.
AvailableCity of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Posted Date
Oct 13, 2025
Due Date
Nov 20, 2025
Release: Oct 13, 2025
City of Crystal Lake
Close: Nov 20, 2025
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis