Retrieving RFP details
Release
Close
City of Havelock
Work includes resurfacing roads and repair asphalt utility cuts, grading, milling, asphalt overlay, adjustment of water valves and manholes, and shoulder repair. 4,924 sy incidental milling; milling asphalt pavement, 1.5" depth; 39,577 sy 1.5" asphalt surface course type s9.5 b; 5 ea adjustment of valve boxes; 7 ea adjustment of manholes; 17,328 lf shoulder repair; traffic control.
City of Havelock, 2025 Paving Maintenance
zip
City of Havelock
Asphalt paving half of the existing walking path around the parks and recreation facility and asphalt paving around the concession stand.
City of Columbus
Construction of the Division of Water Reclamation’s Compost Paving 2025 project, the work for which consists of removing and replacing 26,500 SF of heavy duty concrete pavement, and other work.
City of Havelock
Upgrading the ada standards, making some electrical repairs and upgrades, and painting the boy's and girl's bathrooms within the interior of the building for the boys and girls club.
Release
Sep 26, 2025
Close
Nov 25, 2025