Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Copeville Sud
Pump station improvements.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Lewiston
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
City of Lewiston
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
AvailableCity of Palm Coast
To perform the rehabilitation of master pump station 37-4. Work includes the removal and replacement of existing wet well liner, demolition and reconstruction of the wet well floor, removal and replacement of all pump base hardware, guide rails, brackets, and appurtenances, and the installation of new city-approved wet well coating and flygt pump mounting components.
Posted Date
Oct 29, 2025
Due Date
Nov 25, 2025
Release: Oct 29, 2025
City of Palm Coast
Close: Nov 25, 2025
To perform the rehabilitation of master pump station 37-4. Work includes the removal and replacement of existing wet well liner, demolition and reconstruction of the wet well floor, removal and replacement of all pump base hardware, guide rails, brackets, and appurtenances, and the installation of new city-approved wet well coating and flygt pump mounting components.
AvailableCity of Krum
Project includes the construction of a 694 GPM firm capacity pump station including chemical and electrical rooms, stand-by generator, electrical service, site improvements, fencing, yarding piping and approx. 5,000 LF of 12" water line. Approx. 4,490 LF 12" PVC Water Line (By Open Cut); 88 SY Concrete Driveway; 439 LF 24" Steel Casing;
Posted Date
Nov 6, 2025
Due Date
Dec 2, 2025
Release: Nov 6, 2025
City of Krum
Close: Dec 2, 2025
Project includes the construction of a 694 GPM firm capacity pump station including chemical and electrical rooms, stand-by generator, electrical service, site improvements, fencing, yarding piping and approx. 5,000 LF of 12" water line. Approx. 4,490 LF 12" PVC Water Line (By Open Cut); 88 SY Concrete Driveway; 439 LF 24" Steel Casing;
AvailableJefferson County
Project includes installation of 8' by 6' precast concrete bypass structure with cast-in-place concrete base, stainless steel weir assembly, and monolithic liner; Improvements and conversion of existing wet well and dry pit into auxiliary overflow storage structure; • Installation of approximately 60 LF of 24" new sanitary sewer pipe; Installation of two 60" precast concrete sewer manholes; Installation of one 12' by 12' precast concrete wet well with monolithic liner; Installation of four submersible pumps with all controls, piping, valves, fittings, and appurtenances; Installation of one 16' by 8' precast concrete valve vault: Installation of one 60" precast concrete manhole with magnetic flow meter; Installation of one elevated generator building with exterior platform and natural-gas-powered backup generator and electrical equipment and pump station electrical components; Removal, relocation, and installation of electrical riser poles, transformers, and overhead lines; • New Spire Gas service and relocations; Site improvements, including gates, fencing, concrete paving, concrete pump station pad, lighting, and restoration work.
Posted Date
Oct 30, 2025
Due Date
Dec 19, 2025
Release: Oct 30, 2025
Jefferson County
Close: Dec 19, 2025
Project includes installation of 8' by 6' precast concrete bypass structure with cast-in-place concrete base, stainless steel weir assembly, and monolithic liner; Improvements and conversion of existing wet well and dry pit into auxiliary overflow storage structure; • Installation of approximately 60 LF of 24" new sanitary sewer pipe; Installation of two 60" precast concrete sewer manholes; Installation of one 12' by 12' precast concrete wet well with monolithic liner; Installation of four submersible pumps with all controls, piping, valves, fittings, and appurtenances; Installation of one 16' by 8' precast concrete valve vault: Installation of one 60" precast concrete manhole with magnetic flow meter; Installation of one elevated generator building with exterior platform and natural-gas-powered backup generator and electrical equipment and pump station electrical components; Removal, relocation, and installation of electrical riser poles, transformers, and overhead lines; • New Spire Gas service and relocations; Site improvements, including gates, fencing, concrete paving, concrete pump station pad, lighting, and restoration work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis