Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
California Department of Corrections and Rehabilitation
Chiller plant and cooling tower maintenance and repair services.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
California Department of General Services
Work includes : provide new chiller yard and pump house concrete slabs, graded, and sloped; provide new concrete equipment pads; provide new chain-link fence and gates for chiller yard; provide new underground chilled water supply and return piping; provide domestic water and sewer underground lines and manhole; see outside link.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
California Department of General Services
Close: Dec 17, 2025
Work includes : provide new chiller yard and pump house concrete slabs, graded, and sloped; provide new concrete equipment pads; provide new chain-link fence and gates for chiller yard; provide new underground chilled water supply and return piping; provide domestic water and sewer underground lines and manhole; see outside link.
AvailableSalinas Valley Memorial Healthcare District
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Salinas Valley Memorial Healthcare District
Close: Dec 9, 2025
Work consists of replacement of the existing chiller and cooling tower, includes removal of the existing 70-ton nominal chiller and replacement with a new 80-ton nominal chiller; removal of the existing cooling tower and replacement with a new cooling tower; and removal of existing chilled water and condenser water pumps and replacement with new chilled water and condenser water pumps. Installation shall require seismic anchoring and modification of existing housekeeping pads. The new chiller and cooling tower shall be integrated into the existing siemens building management system (bms). A refrigerant leak detection system shall be design-build by the contractor. All electrical work
The University Of Texas Medical Branch
Provide comprehensive maintenance services for all cooling towers across UTMB campuses.
Posted Date
Oct 21, 2025
Due Date
Nov 20, 2025
Release: Oct 21, 2025
The University Of Texas Medical Branch
Close: Nov 20, 2025
Provide comprehensive maintenance services for all cooling towers across UTMB campuses.
Available257-Network Contract Office 17 (36C257)
Provide, testing, inspections, preventative maintenance, corrective repair, emergency repairs, and service calls for the Boiler/Chiller Plant at the Medical Center.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
257-Network Contract Office 17 (36C257)
Close: Dec 18, 2025
Provide, testing, inspections, preventative maintenance, corrective repair, emergency repairs, and service calls for the Boiler/Chiller Plant at the Medical Center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis