Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Savoy
Installation of 43.5 LF of 6'x 8' precast concrete box culvert, headwalls and 4 wingwalls, replace 380 LF of guardrail, 100 LF of 48" high chain link fence, 155 SY of road reconstruction, and other associated work.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Town of Savoy
The work consist of approx 220 CY earth excavation; 820 CY bridge excavation; 525 SY fine grading and compacting; 50 FT sawing asphalt pavement; 350 FT guardrail TL-3.
Posted Date
Oct 23, 2025
Due Date
Dec 9, 2025
Release: Oct 23, 2025
Town of Savoy
Close: Dec 9, 2025
The work consist of approx 220 CY earth excavation; 820 CY bridge excavation; 525 SY fine grading and compacting; 50 FT sawing asphalt pavement; 350 FT guardrail TL-3.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Tom Green County
Provide culvert replacement, road repair, and associated items. Includes fence removal and replacement; remove existing fence within project limits. Replace fence post-construction in original or better condition. Provide temporary fencing. Reconstruct the water gap (flood-prone opening) on the downstream side to match pre-project condition and function. See attached files.
Posted Date
Oct 28, 2025
Due Date
Dec 16, 2025
Release: Oct 28, 2025
Tom Green County
Close: Dec 16, 2025
Provide culvert replacement, road repair, and associated items. Includes fence removal and replacement; remove existing fence within project limits. Replace fence post-construction in original or better condition. Provide temporary fencing. Reconstruct the water gap (flood-prone opening) on the downstream side to match pre-project condition and function. See attached files.
AvailableMultnomah County
Construct new 12-foot diameter culvert under roadway, replacing two failed culverts previously backfilled and paved over includes 144 SY matting type D, 630 foot sediment fence, 555 ton contaminated soil disposal, 2,850 CY general excavation, 193 LF 144" culvert pipe.
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Multnomah County
Close: Dec 9, 2025
Construct new 12-foot diameter culvert under roadway, replacing two failed culverts previously backfilled and paved over includes 144 SY matting type D, 630 foot sediment fence, 555 ton contaminated soil disposal, 2,850 CY general excavation, 193 LF 144" culvert pipe.
AvailableTown of Salina
Remove the existing structure and replacement with a precast box culvert and wingwalls, 180 feet of full-depth asphalt pavement reconstruction, and 83 feet of sewer main relocation.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Town of Salina
Close: Dec 16, 2025
Remove the existing structure and replacement with a precast box culvert and wingwalls, 180 feet of full-depth asphalt pavement reconstruction, and 83 feet of sewer main relocation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →