Retrieving RFP details
Release
Close
Kenai Peninsula Borough
Work includes complete demolition and removal of the central peninsula landfill baler system, heat exchanger, and associated ductwork. Work will include draining oil tanks, removing all associated components of the baler system, removing all associated components of the heat exchanger system, and disposing of all demolished materials. After baler demolition, backfill the site and pour concrete slab to slope correctly with existing pad.
Kenai Peninsula Borough
DESIGN-BUILD: Provide professional design services for the central peninsula landfill baler building. This redesign will address: new office space, meeting room, bathrooms, front desk public area and designated operational waste/recycling areas.
City of Douglasville
Demolition and removal of a 4,500 SF building.
Town of Highgate
Perform demolition, removal, and backfill services for the properties, including septic systems, water wells, buildings, foundations, electrical and phone lines, pavement, parking, fuel tanks, debris, and household hazardous materials.
Release
Oct 21, 2025
Close
Nov 04, 2025