Retrieving RFP details
Release
Close
New York Dormitory Authority
Provide professional construction management services during the construction phases of the project for the psychiatric center building 39 rehabilitation. The first two phases of the project have been recently completed. The remaining four (4) phases consist of renovating the four (4) patient wings of the building. Each phase will include abatement of hazardous materials, the replacement of approximately 350 windows, installation of new mechanical, electrical, plumbing, fire protection and roofing systems. Program spaces within the scope of renovation include patient/resident services, bedrooms, common spaces, dining facilities and staff spaces.
Genesee County
Construction manager services for a new recycling and education center.
Montgomery College
Provide construction manager at risk for the student services center.
Borough of Cliffside Park
Design-Build Team to provide certain design consultant and general contracting services for the construction of a new Recreation Center, Library and Parking Facility. The Project will consist of constructing the Municipal Library and Recreation Center which will feature 40,501 SF. of interior space, 3,165 SF. of rooftop outdoor gathering space, and 20,556 SF. of enclosed parking. The new building will be three levels, inclusive of two levels of parking under portions of the building. The Project will include demolishing all existing buildings and structures on the site and installing any temporary shoring and/or permanent retaining walls as may be specified by the design engineer to maintain the structural integrity of adjacent roadways and properties. The Project's design will utilize the existing slope and topography of the site to provide access at street grade to all three levels of the building.
Release
Oct 24, 2025
Close
Nov 24, 2025