Retrieving RFP details
Release
Close
City of Arlington
Project consists of: Replacement of approximately 512 - ¾¿ water meters, 4 - 1¿ water meters, 17 ¿ 2¿ water meters, 3 ¿ 2 1/2¿ water meters and 1 - 4¿ water meters with remote read water meters and system for operation.
CDBG Project Water Meters Replacements
zip
Borough of Slatington
The Work to be performed for the Slatington Water Meter Replacements consists of the following: Provide labor and materials to replace existing water meters through the Slatington water system, including meters located in Slatington Borough and Washington Township, as more particularly specified in the Contract Documents.
City of Clayton
2025 CDBG Curb Ramp & Sidewalk Replacements. Work includes the removal and replacement of streetscape sidewalk along Bonhomme Ave. in accordance with the Americans with Disabilities Act (ADA). Traffic control, restoration, and other incidental items shall be included as shown in the specifications.
Village of Lyons
The project consists of the demolition of the existing water tower, the construction of a new 100,000-gallon water tower, the installation of water mains and associated appurtenances, and the installation of storm sewer pipe and structures.
Release
Sep 17, 2025
Close
Nov 06, 2025