City of Clayton
2025 CDBG Curb Ramp & Sidewalk Replacements. Work includes the removal and replacement of streetscape sidewalk along Bonhomme Ave. in accordance with the Americans with Disabilities Act (ADA). Traffic control, restoration, and other incidental items shall be included as shown in the specifications.
Town of Phillipsburg
2025 Road Program. Improvements include reconstruction of curbing, sidewalk, and asphalt to reconstruct ADA compliant curb ramps.
City of Bridgeport
Work includes per CY excavation, disposal; per SF 8" concrete driveway apron; per SF 5" concrete sidewalk with wire mesh; per SF brick sidewalk on concrete base; per LF granite curb 5" x 18"; per LF reset existing granite curb ; per SF permanent pavement repair; per EA tree gate installed; per EA tree pit includes tree; per sf 3' wide grass strip; per LF 18" concrete sidewalk curb; per LF 12" concrete driveway curb; per EA trash receptacle; per EA sidewalk bench; per LF 1' dia PVC conduit; per LF 1' diameter rigid metal conduit; per ea standard light & foundation, per ea street light cable & electrical service. See outside link.
Michigan Department of Technology, Management and Budget
0.55 mi of concrete curb, sidewalk and ramp, driveway replacement and pavement markings.
City of Monterey Park
The bid is for a public works project that consists of the removal & repair of 29 ADA ramps.
Release
Oct 22, 2025
Close
Oct 29, 2025