Retrieving RFP details
Release
Close
Santa Clara Valley Water District
Construction of the Penitencia Water Treatment Plant Residuals Management Project.
Brownsville Public Utilities Board
Work includes water treatment residuals removal & disposal for water treatment plant no. 2 sludge drying lagoon
South Central Connecticut Regional Water Authority
The project includes installation of a lined drying bed at the west river water treatment plant, inclusive of an underdrain system to collect leachate. A pump station is will be installed to collect drying bed leachate and precipitation and pump it up to the existing lagoons. Further, a force main connecting the pump station to the lagoon influent piping will be installed, along with lagoon desludging pumps in each lagoon.
City of Lake Havasu City
This project consists of replacing an existing gas Chlorination system with a new liquid chlorination system at the Lake Havasu City Water Treatment Plant. This includes constructing a new airconditioned masonry building to house the necessary equipment.
Release
Aug 13, 2025
Close
Nov 12, 2025