Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Department of Veterans Affairs Regional Offices
Provide building 16 flat roof replacement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Department of Veterans Affairs Regional Offices
Project consists of but not limited to replacement of flat roof. See attached file.
Posted Date
Nov 13, 2025
Due Date
Nov 20, 2025
Release: Nov 13, 2025
Department of Veterans Affairs Regional Offices
Close: Nov 20, 2025
Project consists of but not limited to replacement of flat roof. See attached file.
AvailableRhode Island Office of Energy Resources
Provide multiple roof replacements - maximum security, minimum security, high security, correctional industries building concurrently. Removal and replacement of existing roof assemblies at Maximum to include, but not limited to, vapor barrier, 4" to 12" of insulation, wood fiberboard board, membranes down to concrete deck, curbs, flashing, and edge metal. Removal of (2) existing nonfunctioning rooftop units and infill concrete deck with existing adjacent materials, new roof to be flush with existing. RIDOC is looking to be fully replaced with 2-ply modified bitumen, recovery board and tapered insulation.See attached file.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
Rhode Island Office of Energy Resources
Close: Dec 5, 2025
Provide multiple roof replacements - maximum security, minimum security, high security, correctional industries building concurrently. Removal and replacement of existing roof assemblies at Maximum to include, but not limited to, vapor barrier, 4" to 12" of insulation, wood fiberboard board, membranes down to concrete deck, curbs, flashing, and edge metal. Removal of (2) existing nonfunctioning rooftop units and infill concrete deck with existing adjacent materials, new roof to be flush with existing. RIDOC is looking to be fully replaced with 2-ply modified bitumen, recovery board and tapered insulation.See attached file.
University Of North Carolina At Chapel Hill
Work includes administrative office building roof replacement.
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
University Of North Carolina At Chapel Hill
Close: Dec 17, 2025
Work includes administrative office building roof replacement.
AvailableMichigan Department of Technology, Management and Budget
Work includes complete removal and replacement of the shingle and EPDM roof.
Posted Date
Oct 31, 2025
Due Date
Nov 26, 2025
Release: Oct 31, 2025
Michigan Department of Technology, Management and Budget
Close: Nov 26, 2025
Work includes complete removal and replacement of the shingle and EPDM roof.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis