Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Plumbing: The scope of work generally consist of construction of plumbing of new social hall including 4" fire/domestic water service; 2-1/2" gas line service, downspout collectors; and sanitary sewer lateral.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of al mechanical work associated with the Social Hall including condensing units, mini-splits, ductwork, unit heaters, air handler, exhaust/supply fans, ductwork and diffusers and all necessary appurtenances. Mechanical Contractor to perform all work.
Posted Date
Dec 12, 2025
Due Date
Jan 7, 2026
Release: Dec 12, 2025
Close: Jan 7, 2026
Installation of al mechanical work associated with the Social Hall including condensing units, mini-splits, ductwork, unit heaters, air handler, exhaust/supply fans, ductwork and diffusers and all necessary appurtenances. Mechanical Contractor to perform all work.
Premium
Access the largest public sector contact database
Construction of a fire protection system for the new social hall including fire service entrance, sprinkler heads and all other associated piping and necessary appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 7, 2026
Release: Dec 12, 2025
Close: Jan 7, 2026
Construction of a fire protection system for the new social hall including fire service entrance, sprinkler heads and all other associated piping and necessary appurtenances.
AvailableConstruction of an approx. 3,500 SF pre-engineered metal social hall including site preparation of building pad; excavation for foundations; concrete foundations; construction of interior walls and wall finishes for various rooms; painting; blocking for MEP trades; stone subbase; reinforced concrete floor; foundation drains; installation of toilet room accessories; interior and exterior signage; floor finishes; suspended acoustical ceiling system; fire extinguishers; insulation; sheathing; underlayment and metal standing seam roof panels; new doors, door hardware and windows; gutters and downspouts; fascia and vented soffit; stone backfill for trenches; restoration of disturbed areas; and all other items and necessary appurtenances. There is an add alternate for epoxy floor coating. Contractor is responsible for extending foundation drains 5' outside of the building. Site contractor to then extend drains to storm sewer system. Plumbing contractor will connect to downspouts and extend roof drain collector within 5' outside of building.
Posted Date
Dec 12, 2025
Due Date
Jan 7, 2026
Release: Dec 12, 2025
Close: Jan 7, 2026
Construction of an approx. 3,500 SF pre-engineered metal social hall including site preparation of building pad; excavation for foundations; concrete foundations; construction of interior walls and wall finishes for various rooms; painting; blocking for MEP trades; stone subbase; reinforced concrete floor; foundation drains; installation of toilet room accessories; interior and exterior signage; floor finishes; suspended acoustical ceiling system; fire extinguishers; insulation; sheathing; underlayment and metal standing seam roof panels; new doors, door hardware and windows; gutters and downspouts; fascia and vented soffit; stone backfill for trenches; restoration of disturbed areas; and all other items and necessary appurtenances. There is an add alternate for epoxy floor coating. Contractor is responsible for extending foundation drains 5' outside of the building. Site contractor to then extend drains to storm sewer system. Plumbing contractor will connect to downspouts and extend roof drain collector within 5' outside of building.
AvailableElectrical: the scope of work generally includes supply of electrical service including distribution panels and all necessary wiring and conduit; LED lighting; occupancy sensors; receptacles; data ports and conduit; emergency lighting; fire alarm system; service entrance conductors and conduit from ct cabinet to utility transformers per utility company requirements; emergency generator and generator transfer switch; generator annunciation panel; connections to mechanical equipment; site lighting, wiring and conduit; and all necessary appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 7, 2026
Release: Dec 12, 2025
Close: Jan 7, 2026
Electrical: the scope of work generally includes supply of electrical service including distribution panels and all necessary wiring and conduit; LED lighting; occupancy sensors; receptacles; data ports and conduit; emergency lighting; fire alarm system; service entrance conductors and conduit from ct cabinet to utility transformers per utility company requirements; emergency generator and generator transfer switch; generator annunciation panel; connections to mechanical equipment; site lighting, wiring and conduit; and all necessary appurtenances.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis