Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Bridgman Public School District
Project consists of renovation and ventilation upgrades. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Pico Rivera
Project includes work on the existing building, pool deck, site, and parking lot. Work includes: replacement of existing finishes, fixtures, and equipment with new. Replacement of existing mechanical, electrical, and plumbing systems with new. Grind and overlay, and re-stripe of existing parking lot. Reconfiguration of existing community center & aquatic building, not limited to offices, meeting rooms, program support spaces, restrooms, and locker facilities. Conform existing parking lot accessible path of travel to be code-compliant, pool deck, and demo of existing pool. 5,918 SF of occupied space to the existing 12,900 SF building.
Posted Date
Nov 17, 2025
Due Date
Jan 8, 2026
Release: Nov 17, 2025
City of Pico Rivera
Close: Jan 8, 2026
Project includes work on the existing building, pool deck, site, and parking lot. Work includes: replacement of existing finishes, fixtures, and equipment with new. Replacement of existing mechanical, electrical, and plumbing systems with new. Grind and overlay, and re-stripe of existing parking lot. Reconfiguration of existing community center & aquatic building, not limited to offices, meeting rooms, program support spaces, restrooms, and locker facilities. Conform existing parking lot accessible path of travel to be code-compliant, pool deck, and demo of existing pool. 5,918 SF of occupied space to the existing 12,900 SF building.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Dearborn Heights
Project includes only the mechanical (HVAC) as well as the civil works but not the actual Dispatch workstations. Key upgrades HVAC and a new exterior.
Posted Date
Sep 4, 2025
Due Date
Dec 1, 2025
Release: Sep 4, 2025
City of Dearborn Heights
Close: Dec 1, 2025
Project includes only the mechanical (HVAC) as well as the civil works but not the actual Dispatch workstations. Key upgrades HVAC and a new exterior.
AvailableWest Hollywood Preschool & Bais Mordechai
Security upgrades, including fencing, lighting, impact-resistant doors/windows, access control, radios, & related improvements.
Posted Date
Nov 16, 2025
Due Date
Dec 2, 2025
Release: Nov 16, 2025
West Hollywood Preschool & Bais Mordechai
Close: Dec 2, 2025
Security upgrades, including fencing, lighting, impact-resistant doors/windows, access control, radios, & related improvements.
AvailableJohnson County Community College
Work includes warehouse renovation that includes reconfigured restrooms, new finishes, casework, doors, windows in several areas, and air conditioning for the large warehouse space.
Posted Date
Nov 14, 2025
Due Date
Dec 9, 2025
Release: Nov 14, 2025
Johnson County Community College
Close: Dec 9, 2025
Work includes warehouse renovation that includes reconfigured restrooms, new finishes, casework, doors, windows in several areas, and air conditioning for the large warehouse space.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →