Retrieving RFP details
Release
Close
Prince George's County
Work includes installation of approx 27 LF of new 8" water main and 3,851 LF of new 16" water main, and the replacement of approx 237 LF of 8" water main, 8 LF of 10" water main and 43 LF of 16" water main. The contract also includes installation of approx 2,254 LF of water house connections; replace existing main with 8" dip; furnish 8" DIP and fittings; install 4" dip for blow-off leads; install 6" DIP fire hydrant leads; replace existing 3/4 and 1" water house connections with 1" water house connection; furnish 1" copper pipe and fittings for water house connections with single inside meter. See outside link.
Bradley Blvd Water Main Replacement
zip
Seminole County
Construction of a new sewer force main and reclaimed water main. The project involves the furnishing and installation of a new force main and reclaimed water main, which will be installed through open cut along the easement. The force main will be extended using directional drilling techniques. The existing gravity sewer main lacks the capacity to accommodate future flows from upcoming developments. Asphalt Removal and Replacement 1790 sy, Concrete Driveway and Sidewalk Removal and Replacement 75 sy, Concrete Curb and Gutter Replacement 26 lf, Landscape Restoration, Sodding and Hedges 41859 sf, 10" PVC Force Main - Open Cut 1989 lf, 10" HDPE Force Main - HDD 1797 lf, 12" PVC Reclaimed Water - Open Cut 1504, 12" HDPE Reclaimed Water - HDD 212 lf, Connection to Existing Wet Well - Lockwood Blvd 1 ea. See outside link or attached files.
City of Fairfield
General Work Description: Installation of approx. 1,100 LF of 8" diameter potable water pipeline and appurtenances, abandonment of approx. 1,600 LF of 16" diameter potable water pipeline, partially located beneath Interstate 80, 2" grind and overlay of Mankas Blvd, and ADA curb ramps installation where pipeline replacement is planned.
City of Miami Beach
Works include approx. 3,871 LF of 24" zinc coated DIP and fittings for water main; 71 LF of 8" zinc coated DIP and fittings for water main; 4 EA 24-" mechanical joint butterfly valves for water main, valve box & lid and riser pipe; 7 EA installing 6" mechanical joint gate valves for water main, valve box & lid and riser pipe; 4,249 LF of furnishing and installing V -Bio polyethylene encasement for any size DIP, fitting or valve, complete; 687 LF of 8" PVC pipe and fittings for gravity sewer line; 2,675 LF of constructing concrete curb and gutter restoration to match existing. See outside link.
Release
Oct 15, 2025
Close
Nov 12, 2025