Retrieving RFP details
Release
Close
North Carolina State University At Raleigh
Provide ada and code deficiencies at hall.
NCSU Biltmore-CodeDeficiencies_18892P
Alaska Regional Office (97000)
Provide glba correct medium voltage deficiencies.
256-Network Contract Office 16 (36C256)
Medical Gas Deficiencies. A new underground communication line will be run between the main hospital building at the Little Rock (JLM) Campus and the adjacent storage tanks at the northeast portion of the facility. The existing pavement will be removed and replaced for the installation of the new communication line. At the building entry location there is currently a temporary construction fence and mechanical equipment that will require coordination to accommodate installation. A new underground communication line will be run between buildings 69 and 170. Installation will involve crossing an existing roadway. The existing sidewalk, pavement, curb and gutter will be removed and replaced for the installation of the new communication line. The proposed route will also run adjacent to an existing enclosure for liquid oxygen. The main oxygen shutoff valve and check valves in the chiller plant at the JLM campus will be replaced, and additional shutoff valves will be provided to allow for a temporary connection to oxygen bottles while system maintenance is being performed. Temporary oxygen will be provided, as needed, during shutdown at the zone valve level.
260-Network Contract Office 20 (36C260)
Work will include upgrading fans with new Fan Walls, and addition of frequency drives to fan systems. Modify existing downstream air boot/collar to maximize laminar airflow coming from new fan walls. Provide DDC and enthalpy control of AHU dampers programming to allow for discharge air reset of Air handling unit. Provide all new sensors installed, labeling of all new and relabeling of existing terminations, routing of all signal wire in conduit, all programming, and commissioning of new points. Provide for replacement of pneumatic actuators, valves and components to DDC. See attached file.
Release
Oct 14, 2025
Close
Nov 10, 2025