Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Swale Retrofit Project. This work will include the vegetative restoration and realignment of a swale that traverses Township property adjacent to Road. The Work will include, but is not limited to, the following: Mobilization, Sanitary facilities, Safety requirements as required by Local, State and Federal agencies, Excavation, compaction and backfill for swale construction, Topsoiling, seeding and mulching, Placement and maintaining erosion and sedimentation control measures as per Contract Drawings, Maintenance and protection of traffic per Township requirements.• Surface restoration. • Clean up and demobilization.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Swale Retrofit Project. This work will include the vegetative restoration and realignment of a swale that traverses Township property adjacent to Road. The Work will include, but is not limited to, the following: Mobilization, Sanitary facilities, Safety requirements as required by Local, State and Federal agencies, Excavation, compaction and backfill for swale construction, Topsoiling, seeding and mulching, Placement and maintaining erosion and sedimentation control measures as per Contract Drawings, Maintenance and protection of traffic per Township requirements.• Surface restoration. • Clean up and demobilization.
Posted Date
Dec 10, 2025
Due Date
Dec 30, 2025
Release: Dec 10, 2025
Close: Dec 30, 2025
Swale Retrofit Project. This work will include the vegetative restoration and realignment of a swale that traverses Township property adjacent to Road. The Work will include, but is not limited to, the following: Mobilization, Sanitary facilities, Safety requirements as required by Local, State and Federal agencies, Excavation, compaction and backfill for swale construction, Topsoiling, seeding and mulching, Placement and maintaining erosion and sedimentation control measures as per Contract Drawings, Maintenance and protection of traffic per Township requirements.• Surface restoration. • Clean up and demobilization.
AvailableThe Borough of Caldwell (Essex County, NJ) is soliciting sealed bids for the Clarifier Retrofit Project at the Caldwell Wastewater Treatment Plant, including partial demolition and modification to existing sludge collector equipment in two final clarifiers. Bids are due to the Borough Clerk on December 18, 2025 at 11:00 AM prevailing time.
Posted Date
Nov 13, 2025
Due Date
Dec 18, 2025
Release: Nov 13, 2025
Close: Dec 18, 2025
The Borough of Caldwell (Essex County, NJ) is soliciting sealed bids for the Clarifier Retrofit Project at the Caldwell Wastewater Treatment Plant, including partial demolition and modification to existing sludge collector equipment in two final clarifiers. Bids are due to the Borough Clerk on December 18, 2025 at 11:00 AM prevailing time.
AvailableBoat ramp stormwater retrofit project. Improvements include site preparation, clearing and grubbing, excavation and backfill, stormwater management practices, paving, and planting.
Posted Date
Nov 26, 2025
Due Date
Dec 18, 2025
Release: Nov 26, 2025
Close: Dec 18, 2025
Boat ramp stormwater retrofit project. Improvements include site preparation, clearing and grubbing, excavation and backfill, stormwater management practices, paving, and planting.
AvailableRelease: Nov 26, 2025
Close: Dec 30, 2025
Road improvement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis