Get complete source documentation & analysis
City of New Britain
Work includes 1 LS securing, construction, and dismantling of a waste stockpile and treatment area; 8 EA ctdot boundary marker (survey monument); 1 LS clearing and grubbing; 600 TN disposal of controlled materials; 570 LF cut bituminous concrete pavement; 245 SF anti-tracking pad; 120 CY granular fill; 4,620 LF sedimentation control system; 50 EA sediment control system at catch basin; 25 CY rock in drainage trench excavation 0' - 10'; 55 TN processed aggregate; 2,010 SY bituminous concrete patching - full depth. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Mount Vernon
The City of Mount Vernon seeks consultant services to deliver preliminary civil engineering design, plans and specifications, permitting documentation, right‑of‑way/real estate services, and construction management and inspection documentation for improvements to the Kulshan Trail. The project will add pedestrian‑style lighting, underground power, and security camera amenities along the trail segment between North Laventure Road and North 30th Street and must comply with WSDOT Local Agency Guidelines.
Posted Date
Oct 28, 2025
Due Date
Nov 19, 2025
Release: Oct 28, 2025
City of Mount Vernon
Close: Nov 19, 2025
The City of Mount Vernon seeks consultant services to deliver preliminary civil engineering design, plans and specifications, permitting documentation, right‑of‑way/real estate services, and construction management and inspection documentation for improvements to the Kulshan Trail. The project will add pedestrian‑style lighting, underground power, and security camera amenities along the trail segment between North Laventure Road and North 30th Street and must comply with WSDOT Local Agency Guidelines.
AvailableWayne County
Trail Phase 4A Project.
Posted Date
Oct 31, 2025
Due Date
Nov 21, 2025
Release: Oct 31, 2025
Wayne County
Close: Nov 21, 2025
Trail Phase 4A Project.
AvailablePorter County
The project consists of the construction of approx. 2.87 miles of new 10 ft wide multi-use trail. The project will include corridor clearing and earthwork to prepare for the new trail, which will be 4" of HMA on 6" of Compacted Aggregate No. 53 with Concrete Curb Ramps at each street crossing. The Trail sections will also include areas of modular block retaining wall and timber boardwalk on helical piers. Share the road sections will include striping, signage and installation of delineator bollards. Drainage improvements include new culverts and trench drains. The project will include improvements for a pedestrian crossing, including curbs, curb ramps and a RRFB pedestrian crossing signage.
Posted Date
Nov 13, 2025
Due Date
Dec 9, 2025
Release: Nov 13, 2025
Porter County
Close: Dec 9, 2025
The project consists of the construction of approx. 2.87 miles of new 10 ft wide multi-use trail. The project will include corridor clearing and earthwork to prepare for the new trail, which will be 4" of HMA on 6" of Compacted Aggregate No. 53 with Concrete Curb Ramps at each street crossing. The Trail sections will also include areas of modular block retaining wall and timber boardwalk on helical piers. Share the road sections will include striping, signage and installation of delineator bollards. Drainage improvements include new culverts and trench drains. The project will include improvements for a pedestrian crossing, including curbs, curb ramps and a RRFB pedestrian crossing signage.
Orange County
Work consist of shingle creek regional trail.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Orange County
Close: Dec 18, 2025
Work consist of shingle creek regional trail.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis