Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
West Virginia Purchasing Division
The West Virginia Purchasing Division, on behalf of the West Virginia Division of Natural Resources, seeks construction services to perform modifications to Bear Rock Dam No.1 and Dam No.2 at Bear Rock Lakes Wildlife Management Area via a Centralized Request for Quote. The solicitation indicates an estimated project value in the $1,000,000–$5,000,000 range and a response deadline of December 18, 2025.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
South Carolina Governor's School for the Arts and Humanities
The South Carolina Governor's School for the Arts and Humanities seeks bids to replace the existing generator serving the Kitchen Building; the existing 150KW generator will be abandoned in place. This solicitation is a rebid with modifications using Design-Bid-Build delivery and has an estimated construction cost of $150,000–$200,000.
Posted Date
Oct 31, 2025
Due Date
Dec 2, 2025
Release: Oct 31, 2025
South Carolina Governor's School for the Arts and Humanities
Close: Dec 2, 2025
The South Carolina Governor's School for the Arts and Humanities seeks bids to replace the existing generator serving the Kitchen Building; the existing 150KW generator will be abandoned in place. This solicitation is a rebid with modifications using Design-Bid-Build delivery and has an estimated construction cost of $150,000–$200,000.
AvailableFoothill Transit Zone
Arcadia Irwindale Operations and Maintenance Facility to support the use of hydrogen fuel-cell electric buses, as more fully described herein and in the specifications and drawings provided in Part IV of this IFB. The scope of the project includes the replacement of the equipment and systems listed below, associated electrical and mechanical modifications, and repair of impacted finishes and roofing.
Posted Date
Aug 13, 2025
Due Date
Jan 8, 2026
Release: Aug 13, 2025
Foothill Transit Zone
Close: Jan 8, 2026
Arcadia Irwindale Operations and Maintenance Facility to support the use of hydrogen fuel-cell electric buses, as more fully described herein and in the specifications and drawings provided in Part IV of this IFB. The scope of the project includes the replacement of the equipment and systems listed below, associated electrical and mechanical modifications, and repair of impacted finishes and roofing.
AvailableMetro Water Reclamation Of Greater Chicago
Demolish existing pipe supports and install new pipe supports for 36" diameter discharge pipes from Raw Sewage Pumps #1, #2 and #3 in the North Pump Well of the Influent Pumping Station. Where compression-type joining devices are currently used at two locations per discharge pipe, install welded pipe sleeves to permanently join separate sections of discharge piping. Demolish and replace hydraulic piping, hoses, and appurtenances between the control cabinet and all three discharge valve actuators in the Influent Pumping Station North Pump Well. Repair of 6" drain pump suction and discharge pipe connections to the Wet Well wall within the North Pump Well pump room. Perform concrete repairs in the North Pump Well pump room install new debris basket safety restraints and OSHA-compliant anchor points at the top of the Coarse Screen Well inside the Influent Pumping Station.
Posted Date
Apr 2, 2025
Due Date
Dec 9, 2025
Release: Apr 2, 2025
Metro Water Reclamation Of Greater Chicago
Close: Dec 9, 2025
Demolish existing pipe supports and install new pipe supports for 36" diameter discharge pipes from Raw Sewage Pumps #1, #2 and #3 in the North Pump Well of the Influent Pumping Station. Where compression-type joining devices are currently used at two locations per discharge pipe, install welded pipe sleeves to permanently join separate sections of discharge piping. Demolish and replace hydraulic piping, hoses, and appurtenances between the control cabinet and all three discharge valve actuators in the Influent Pumping Station North Pump Well. Repair of 6" drain pump suction and discharge pipe connections to the Wet Well wall within the North Pump Well pump room. Perform concrete repairs in the North Pump Well pump room install new debris basket safety restraints and OSHA-compliant anchor points at the top of the Coarse Screen Well inside the Influent Pumping Station.
AvailableTexas Workforce Commission
Work includes home modifications for a single vocational rehabilitation (VR) customer.
Posted Date
-
Due Date
Nov 24, 2025
Release: -
Texas Workforce Commission
Close: Nov 24, 2025
Work includes home modifications for a single vocational rehabilitation (VR) customer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis